Creating success in grid-scale battery storage, together.

Power infrastructure: a substation, transmission towers and grid-scale battery storage

Electricity Market Guide

The 3 power markets that grid-scale battery storage takes part in

Balancing, capacity and wholesale. This page sorts out the 3 markets, each with a different role and time frame, and explains what value a battery provides in each and what to check when considering a project.

* This page is a general explanation of the overall system. It does not guarantee the revenue or market participation of any particular project.

Answer in 1 minute

In short: the 3 markets value the same electricity in different ways

A

The ability to adjust

The value of changing charge and discharge at the moment it is needed, to match supply with demand.

B

Capacity kept ready

The value of keeping equipment available that can supply power when it is needed in the future.

C

The energy itself

The value of buying and selling the stored electricity according to prices and supply and demand.

Japan's power infrastructure: renewable energy equipment and the transmission network

Electricity needs demand and supply to match

Demand Supply Match

A battery switches between charging and discharging, absorbing the gap between supply and demand across hours of the day.

Why Markets Exist

A stable power supply needs provisions on different time frames

Electricity is hard to store in bulk, so the amount used and the amount generated must always be kept close. To cope with the swings of renewable energy and changes in demand, several markets share the work, from short-term balancing to future supply capacity.

01

Swings from seconds to hours

Small mismatches caused by weather or changes in demand are covered by resources that can respond.

02

Energy for tomorrow and today

Energy is bought and sold on the basis of forecasts, balancing surplus and shortfall economically.

03

Supply capacity years ahead

To prepare for future peak demand, the generation and storage capacity needed is secured in advance.

Three Market Roles

The 3 markets a battery takes part in

Separating the value traded, the time frame and the main operating body makes the overall picture easier to grasp.

Market participation has requirements covering products, equipment, metering, communications and response. Check the specific conditions in the latest rules.

MARKET 01

Balancing marketBalancing Market

Role
Adjusts short-term swings in supply and demand
Value
Balancing capacity and the energy delivered in response
Time frame
Seconds to hours
Parties
General T&D operators / EPRX
See how it works

MARKET 02

Capacity marketCapacity Market

Role
Secures the supply capacity needed in the future
Value
The ability to supply
Time frame
In principle, 4 years before the delivery year
Parties
Organization for Cross-regional Coordination of Transmission Operators (OCCTO)
See how it works

MARKET 03

Wholesale power marketWholesale Market

Role
Buys and sells energy
Value
The energy actually delivered
Time frame
Day-ahead to same day
Parties
Japan Electric Power Exchange (JEPX)
See how it works

Comparison

The 3 markets compared side by side

Beyond the names of the revenue streams, it matters to lay out the value provided and the conditions to be met.

Item Balancing market Capacity market Wholesale power market
Purpose Fill short-term gaps between supply and demand, and keep frequency and grid operation stable Secure the supply capacity needed for future demand Buy and sell energy on the basis of generation and demand plans
Value assessed The ability, and the record, of changing output on instruction The ability to supply when needed The energy actually delivered
Typical time frame Seconds to hours Secured years in advance Day-ahead and same-day, slot by slot
The battery's role Absorb swings with fast charge and discharge control Stay available as supply capacity Charge and discharge while watching prices and supply and demand
Main points to watch Response performance, metering, communications, compliance with instructions, penalties Obligation to provide capacity, effectiveness tests, capacity contracts Price volatility, efficiency, degradation, fees, imbalance charges

* Names, operating bodies and the description of the system are an outline. Check product categories, participation requirements and settlement methods in the latest official materials.

Time Horizon

From seconds to years ahead

Using its fast response and flexible charge and discharge, a battery takes part in value on different time frames.

SECONDS

Instant response

Follows frequency changes and small supply-demand gaps

HOURS

Adjustment within the hour

Corrects forecast errors and sudden changes in demand

DAY

Day-ahead and same-day trading

Operates on energy volumes and price spreads

YEARS

Future supply capacity

Secures the equipment capacity needed, in advance

Combining grid-scale battery storage with market operation

Allocating a finite battery capability

Operation has to watch output, state of charge, degradation and the capacity already committed, so the same capability is not used twice.

Portfolio Operation

Not "enter all 3 markets", but which to prioritize, and when

Combining several markets is an option, but a battery's output, capacity, state of charge and cycle count are limited. Portfolio operation has to take in equipment life and the fulfilment of obligations, not just market prices.

01

Reserve committed capability first

Do not let output and capacity promised in the capacity market or as balancing capacity overlap with other uses.

02

Manage state of charge and response headroom

Keep headroom to move in both directions, charging and discharging, so the system is ready for instructions.

03

Reflect degradation and operating cost

Judge on efficiency losses, degradation, maintenance and fees, not on sales alone.

Project Consultation

From understanding the markets to decisions on equipment and the business plan

Which markets a system can take part in depends on its voltage class, equipment specifications, interconnection conditions and operating entity. REVIX JAPAN sorts out the conditions for low-voltage and high-voltage projects and shows you the points to check next.

A business manager discussing market participation for a battery storage project
A manager checking the conditions of a battery storage project in documents

Feasibility Check

5 conditions to check before the markets

Assumptions about market prices alone cannot tell you whether a project is viable. Equipment, grid and operation are checked together.

Interconnection feasibility and voltage class

Connection study, construction cost burden, construction period, output constraints and other grid-side premises.

Output, capacity and charge-discharge efficiency

Not only the market requirements, but the output and energy actually usable in operation.

Control, communications and metering

Receiving instructions, responding, remote monitoring, metering accuracy and data links.

Operating entity and contracts

Aggregator, balancing group, generation and sales, O&M: who is responsible for what, and at what cost.

Degradation, maintenance and financing

Verify long-term cash flow including cycle conditions, warranties, replacement, insurance, interest and tax.

Important Notes

The system and the revenue both change

  • Product requirements, bidding methods, settlement, price rules, penalties and other market rules may change.
  • Auction results, contracted volumes, activation and electricity prices cannot be promised in advance, and future revenue is not guaranteed.
  • Viability also depends on equipment efficiency, degradation, downtime, maintenance costs, fees, imbalance charges, tax and financing terms.
  • For a specific project, check the latest materials and contract terms from EPRX, OCCTO, JEPX, the general T&D operators and other bodies.

FAQ

Frequently asked questions about the power markets and batteries

How the markets differ, revenue, regulatory change, and how low voltage and high voltage compare.

Q What is the difference between the balancing, capacity and wholesale markets?
A

The balancing market deals with balancing capacity for smoothing short-term swings in supply and demand, the capacity market with future supply capacity, and the wholesale market with the energy actually delivered. They differ in time frame and in what is valued.

Q Does a battery earn revenue just by standing by?
A

In some markets and products, keeping the system ready to deliver is itself what is valued. But there are conditions: participation requirements, response to instructions, delivery record and penalties. Simply installing a battery does not produce revenue.

Q Can a battery take part in all 3 markets at the same time?
A

It depends on the equipment specifications, how the aggregator operates, the rules of each market, and the output and capacity that can be reserved in the same time slot. Operating plans and constraint management are needed so the same capability is not promised twice.

Q Are there effects from regulatory changes?
A

Yes. Product requirements, bidding methods, price rules, settlement and penalties may be revised. A business plan should check the latest trading rules, procurement guidelines and published materials, and be tested against several scenarios.

Q Is market revenue guaranteed?
A

No. It varies with clearing prices, contracted volumes, availability, electricity price spreads, degradation, efficiency, maintenance costs, fees, imbalance charges and more. The content here is a general explanation for understanding the system, not an indication of future revenue.

Q Are the relevant markets different for low voltage and high voltage?
A

The way the markets work is the same, but equipment size, connection conditions, metering, control, aggregation method and participation unit differ. Whether a particular system can take part has to be checked system by system.

Q In the wholesale market, does charging at cheap hours and discharging at expensive hours always make a profit?
A

Not always. Charge and discharge efficiency, battery degradation, fees, forecast errors, imbalance charges and output constraints all have to be deducted. Check the full operating cost of the system, not just the price spread.

Q Where should a project study start?
A

Check, in order: grid connection feasibility, system output and capacity, control response, metering and communications, the operating entity, degradation conditions, the maintenance structure and the financing plan. Evaluate equipment, grid and operation together, not just the choice of market.

Start With Conditions

Before choosing a market, shall we sort out what makes the project work?

The viability of grid-scale battery storage is decided by the combination of interconnection, equipment, operation and maintenance, not by the market alone. We sort out the points to check and the next actions to fit where you are in your study.

Discussing the conditions of a battery storage project with a specialist