Creating success in grid-scale battery storage, together.

BESS LAND DUE DILIGENCE

Hazard & Noise Standards

A “falls within the zone” on the map
is not enough to rule land in or out.

Before you buy or sell a battery storage site, we sort out disaster risks and noise conditions, all the way through to the business plan.
From a specialist DD perspective, we explain in plain terms the order of checks that is easy to overlook.

* The preliminary assessment supports initial decisions. It does not replace formal legal, surveying or design judgments.

A view from above of a graded candidate battery storage site near a river and hills

What this page covers

  • 01The order of hazard checks
  • 02How noise is judged
  • 03What DD can sort out

FIRST CONCLUSION

The bottom line: we check not just whether a zone applies,
but whether the project works after measures.

The color on a hazard map or the distance to homes alone does not immediately decide whether a site can be used. The type and severity of the disaster, the equipment layout, grading, drainage and noise control measures, maintenance, and additional costs need to be judged together.

Calls for an early specialist check

Land where several types of risk overlap

  • Several zones where disasters are expected overlap
  • Homes or facilities that need quiet are nearby
  • There is little room for mitigation equipment
  • Where the documents are, or where the boundaries lie, is unclear
Suburban land in Japan where its position relative to a river, a slope and a residential area can be checked

Easier to move forward

Land where measures and spare room can be sorted out

  • The expected risks and the approach to measures are clear
  • There is room for equipment, clearances and delivery access
  • The contact point for checks with the local government can be identified
  • Additional costs can be reflected in the business plan

Even when the result is “not applicable”, other risks may remain, such as differences in ground level on site, drainage, and future development nearby.

HAZARD CHECK

5 location risks to overlay
and check first.

We combine public hazard information with the conditions on site, and consider the impact if the equipment is hit by a disaster.

01

Flooding & inland flooding

We check the expected flood extent and depth, drainage routes, the difference in height from nearby rivers, and the possibility of access being cut off.

What we look at: flood and inland flooding hazard maps, elevation, drainage on site

02

Landslides

We check not only the warning zones but also slopes behind the site, embankment and cut, retaining walls, and routes for rockfall and sediment inflow.

What we look at: zone designations, topographic maps, grading history

03

Liquefaction & ground

At an early stage, we sort out the likelihood of liquefaction, any history as a former river channel or reclaimed land, the bearing capacity of the ground, and concerns about uneven settlement.

What we look at: land condition maps, ground information, land use history

04

Tsunami & storm surge

In coastal areas, we check the impact on the equipment plan, including the expected zones, how long flooding lasts, salt damage, and evacuation and recovery routes.

What we look at: tsunami and storm surge projections, distance from the coast, elevation

05

Combined conditions & on-site differences

On site, we check water paths that hardly show on hazard maps, ground lower than its surroundings, narrow delivery routes, inflow from neighboring land, and maintenance access during a disaster.

What we look at: photos of current conditions, survey drawings, road documents, on-site survey

Where to check public information

The Ministry of Land, Infrastructure, Transport and Tourism (MLIT) “Hazard Map Portal Site” lets you overlay and check flooding, inland flooding, tsunami, storm surge, landslides and more. For the final decision, we also cross-check the latest documents published by the local government.

NOISE PLANNING

Noise is judged not only by “distance”
but by the applicable standards and how sound travels.

The sources of sound change with the equipment used and how it is operated, such as the PCS, transformers, and air conditioning and ventilation equipment. We check, in order, the legal treatment, local government ordinances, and the site boundary and nearby receiving points.

STEP 1

Equipment & legal category

We check whether the equipment used falls under specified facilities under the Noise Regulation Act, and whether notification is required.

STEP 2

Standards by area & time of day

We check area designation, the zoning district, local government ordinances, the day and night time divisions, and schools, hospitals and similar facilities nearby.

STEP 3

Layout & prediction

We assess the site boundary and other points based on sound data, the number of units, clearances, barriers, reflections and terrain.

Checking the layout and surroundings at a candidate battery storage site away from residential areas

Key idea

Environmental quality standards are targets for protecting the living environment. Regulatory standards are standards that must be complied with by the facilities and in the areas they cover. We keep the two apart and check with the local government in advance.

* Specific standard values differ by area, local government, time of day and equipment category, so we check them once the location is fixed.

COMMON PITFALLS

3 oversights that take effect
in the later stages of a plan.

01

Judging a site safe from the map alone

Even outside the zones, local low ground, poor drainage or inflow from neighboring land may remain. We check the differences in ground level on site and the drainage routes.

02

Looking only at existing homes

Future use of adjacent unused land, the zoning district and development potential also affect noise and landscape risks. We leave room to change the layout.

03

Adding the cost of measures later

Embankment, foundations, drainage, noise barriers and equipment changes feed directly into the project’s finances and schedule. The initial DD sorts out a rough estimate of their impact.

A field surveyor checking a candidate battery storage site with a tablet and drawings

FREE PRE-CHECK

The free DD assessment shows
which items to check next.

Even before your documents are complete, we can start an initial check from the location and the information you have now.

  • 01HazardsType of disaster, expected severity, overlaps
  • 02Noise & surroundingsPosition relative to homes and the like, room for the layout
  • 03Site conditionsDifferences in ground level, drainage, road frontage, delivery access, boundaries
  • 04Missing documentsItems to check with the local government, designers and others
Consult us about a free DD assessment

Depending on what you want to discuss, we will refer you to the contact for sale, entrustment or considering a purchase.

PROCESS & DOCUMENTS

From your inquiry to an initial review.

You do not need all the documents from the start. Share what you know, and we will sort out the missing items with you.

  1. 01Send the consultation formEnter the location, the purpose of your study and the status of your documents
  2. 02Initial check of documentsSorting out public information, surrounding conditions and missing documents
  3. 03Hearing your situationChecking the premise, such as sale, purchase or entrustment
  4. 04Guidance on what to check nextSorting out additional surveys, checks with the local government and on-site surveys
Hands of a staff member checking a cadastral map, maps and photos of land on a desk

Documents we would like you to share if you have them

  • Documents showing the location and lot number
  • Cadastral map, certificate of registered matters, land survey map
  • Photos of current conditions and photos showing road frontage and surroundings
  • The utility’s response and connection study documents
  • Documents on grading, the ground and past surveys

Even if you are not sure of a document’s name or whether you can obtain it, please consult us as things stand.

FAQ

Frequently asked questions on hazard and noise standards

QIf a site falls within a hazard area, is it always ruled out as a battery storage site?
A

Not necessarily. We look at the expected flood depth, evacuation and maintenance routes, equipment height, grading and drainage measures, insurance conditions, consultations with the local government and more as a whole, and check whether the project works, including the cost of measures.

QAre noise standards the same nationwide?
A

They are not judged by a single nationwide figure alone. We check the legal category of the equipment, area designation, local government ordinances, the zoning district, the time of day, and nearby homes, schools, hospitals and so on.

QCan noise risk be checked even before the equipment is decided?
A

At an early stage, a first assessment is possible from the distance to nearby homes, the terrain, room for the layout, the zoning district and so on. The final decision requires sound data for the equipment adopted, the number of units, the operating conditions and the layout plan.

QCan you assess land that has no response from the utility or detailed documents?
A

We can start checking from the documents you have now, such as the location, the lot number, a rough sketch, the cadastral map or registration information. After the assessment, we list the missing documents.

QDo you also check the possibility of homes being built nearby in the future?
A

We cover not only current conditions but also the zoning district, unused land nearby, development trends, room for the equipment layout and more. We do not guarantee future relations with neighbors, but we sort out the risks that can be foreseen at the planning stage.

QWhat does the free DD assessment tell me?
A

We sort out initial check items such as hazards, the surrounding environment, road frontage and delivery access, boundaries, noise and the documents needed, and make clear the points that need additional surveys or checks by specialists.

QCan I buy or sell land on the assessment results alone?
A

The preliminary assessment supports initial decisions and does not replace final contract or design decisions. Where necessary, checks are made with the local government, the utility, designers, land surveyors, judicial scriveners and others.

Project staff consulting over a map and documents for a battery storage site

LAND DUE DILIGENCE

Before you sign,
why not sort out the risks you cannot see?

From the location and the documents you have, we can start an initial check of hazards, noise and surrounding conditions.

* The scope of the check and whether additional surveys are needed differ depending on what you consult us about and the status of your documents.