Creating success in grid-scale battery storage, together.

LANDOWNER / INSTALLATION FLOW

For landowners

From the first talk about your land to operation: a predictable
installation process.

All you need at first is the information you have, such as the location of the land. We explain what is checked at each stage, from the free assessment through the on-site check, contract and construction to operation.

There is no obligation to sign a contract at the consultation and assessment stage. Formal terms are presented in writing after surveys and discussions.

Checking a candidate site for low-voltage battery storage equipment in a suburb in Japan
01 Starts with a free assessment
02 You decide at each stage
03 Roles and terms put in writing
  • Installation proceeds in 6 steps, from your inquiry to the start of operation.

  • There is no obligation to sign a contract at the consultation and assessment stage, and you, the landowner, can decide at each stage.

  • Contract terms such as cost sharing and restoration to the original condition are set out for you individually in writing before the contract.

Before You Start

We clear up your first worries, step by step.

“What do I need to prepare?” “When do I sign the contract?” “What about the construction and the costs?” We have set out in advance what you will want to know before installation.

01

Not sure how things proceed after consulting

We share the order first (assessment, on-site check, presentation of terms, contract, construction) and make clear what happens next.

02

Procedures and documents look difficult

You do not need to gather every document from the start. At the stage they are needed, we tell you individually what to check and which documents to prepare.

03

Costs and the scope of responsibility are unclear

Who bears what for equipment, construction, maintenance, and removal and restoration to the original condition is confirmed in the statement of terms and the contract before the formal contract.

6 Steps

Installation proceeds in 6 steps.

Without rushing the contract, we proceed in stages while checking whether the land is suitable and what the terms are. The length of each step varies with the land conditions and the connection procedures.

  1. 01 Inquiry Share land information
  2. 02 Free assessment Initial desk check
  3. 03 On-site check Check surroundings and delivery
  4. 04 Terms and contract Roles and terms put in writing
  5. 05 Design, applications and construction Work done on a shared schedule
  6. 06 Operation and start of land use Move to operation and maintenance

* The above is the standard order of study. The order and details may change depending on the utility’s response, laws, regulations and local ordinances, the land conditions and the type of contract.

Details

What happens at each step

We list separately what we ask of you as the landowner and what REVIX checks and arranges.

STEP 01

Inquiry and sharing land information

You can start with whatever information you have, such as the location and the area.

Landowner
Share the location, approximate area, current condition, ownership and so on
REVIX
Review your inquiry and tell you what additional information the assessment needs

Decision at this stageBased on your inquiry, confirm whether to proceed to the free assessment

A landowner and a staff member consulting while reviewing land documents

STEP 02

Free desk-based assessment

From map information, the surrounding conditions and so on, we check whether the land is a candidate site that can move on to the next survey.

Landowner
Share land documents and photos of the current condition as needed
REVIX
Make an initial check of road frontage, the surroundings, disaster risks, possible equipment layouts and so on

Decision at this stageSort out whether it is worth moving on to an on-site check and a detailed survey

Checking a candidate site for battery storage equipment in a suburb in Japan

STEP 03

On-site check and sorting out the detailed conditions

On site, we check not only the equipment layout but also the delivery route, nearby homes and the construction conditions.

Landowner
Arrange dates for access to the site, and explain the boundaries and current use as far as you know
REVIX
Check the current condition, delivery, foundations, wiring, maintenance space, effects on the surroundings and so on

Decision at this stageSort out the issues needed for the business plan and the presentation of terms

STEP 04

Presentation of terms and review of the contract

Before the contract, we confirm the scope of land use, the contract term, cost sharing, maintenance, removal and so on.

Landowner
Review the terms presented, and discuss any questions or terms you would like
REVIX
Present the survey results, the layout plan, the division of roles and the contract terms clearly

Decision at this stageProceed to the contract procedures only if you agree to the terms

Reviewing contract terms and land documents on a table

STEP 05

Design, applications and construction

Taking the connection procedures and design conditions into account, we share the construction plan and then carry out the work.

Landowner
Respond to any checks or attendance needed, after receiving individual guidance
REVIX
Coordinate the design, related procedures, schedule management, safety management and equipment installation

About the timingVaries with the connection procedures and construction conditions. A schedule is shared once it is fixed

A site where the foundations and installation work for low-voltage battery storage equipment are under way

STEP 06

Start of operation, running and maintenance

After test operation and checks, the equipment goes into operation. Things then move on to the operation and maintenance stage, based on the land-use terms.

Landowner
Check how the land is used under the contract, and share anything to report with the contact point
REVIX
Carry out equipment operation, inspection and maintenance, emergency contact and so on in line with the contract

Start conditionsOperation starts after the necessary tests, procedures and handover checks are complete

White low-voltage battery storage equipment in operation in a suburb in Japan

Responsibilities

Costs, arrangements and restoration to the original condition are put in writing before the contract.

When a land lease is considered, it is not assumed that you, the landowner, buy the equipment. However, cost sharing and restoration to the original condition differ with the land conditions and the type of contract, so we confirm them individually as formal terms.

Item to check Basic arrangement Points to check before the contract
Equipment and construction Assumes a land lease in which the operator designs and arranges them Scope of costs, including grading, exterior work and ancillary work
Applications and procedures The operator takes the lead in coordinating the related procedures Where the owner’s consent, seal or documents are needed
Operation and maintenance The structure for operating and maintaining the equipment is reflected in the contract terms Site access for inspections, emergency contact and the scope of site management
Removal and restoration to the original condition How the end of the contract is handled is written in the contract What is removed, the level of restoration, cost sharing and timing

* This table sets out items that are generally considered. It does not guarantee the contract terms of any individual project.

Preparation

You do not need to have everything ready at the first consultation.

The following information helps the assessment go smoothly. Even if you do not know some of the items, you can still consult us.

  • Location of the land
  • Approximate area and shape
  • Current use
  • Owners and co-owners
  • Photos of the current condition or map screenshots
  • When you would like to use the land, and any concerns
See the site requirements and documents in detail

FREE SITE CHECK

Why not start by checking “whether this land can be considered”?

Without assuming a contract, we set out a starting point for study from the location and the current condition. You can leave items you do not know blank.

A landowner consulting a staff member while looking at a candidate site

FAQ

FAQ about the installation process

We have gathered questions often asked before a consultation. Individual conditions can be checked during the free assessment.

Once I make an inquiry, do I have to sign a contract?

No. The first step is a free assessment to check the location, area and so on of the land. After reviewing the assessment results and the terms, you can decide whether to move on to the next stage.

What should I tell you for the free assessment?

The location, the approximate area, the current use, the ownership of the land and so on, as far as you know. We will tell you individually about documents such as the cadastral map and the certificate of registered matters at the stage they are needed.

How long does it take from inquiry to operation?

It varies with the land conditions, the on-site survey, the connection procedures with the utility, the construction work and so on. We do not set a fixed period. After the survey, we explain the expected schedule.

Do landowners need to arrange the construction?

In a land-lease proposal, the design of the equipment and the arrangement of the construction are assumed to be handled by the operator. Cost sharing and the division of roles are made clear in the proposal and the contract for each project.

Is there an explanation to the neighbors before the contract?

We check the installation conditions and the surroundings, and consider individually the scope of explanation and coordination that is needed. Noise, safety, the delivery route and so on are also covered in the on-site check.

What happens to equipment removal and restoration to the original condition after the contract ends?

The scope of removal, the cost sharing and the standard for restoration to the original condition are confirmed in writing before the contract. Because they differ with how the land is used and the grading carried out, they are written down as individual terms rather than set uniformly.

How many years is the contract term?

It assumes a long-term land lease, and we may present 15 years as a reference term. However, the final contract term, including the survey period, the construction period, the operation period and the renewal terms, differs for each project. Be sure to confirm the start and end dates of the contract and the terms for renewal and extension in writing. * This does not mean that “rent for 15 years is guaranteed unconditionally.” The conditions precedent and the termination conditions also need to be checked.

Can I cancel the contract partway through?

Whether early termination is possible, penalties, equipment removal costs and liability for damages depend on the contract clauses. Because the project involves investment in equipment and grid applications, the contract may not allow the landowner to terminate it freely for their own reasons alone. Check the termination conditions in concrete terms before the contract. * Check not only the verbal explanation but also the termination clause, the damages clause and the force majeure clause in the contract.

START WITH A CHECK

Explore the potential for using your land, starting with a free assessment.

Please tell us what you know, such as the location and the area. After checking the assessment results, you can decide whether to proceed.

* This does not guarantee the assessment results, profitability, whether connection is possible or that a contract will be concluded.