Not sure how things proceed after consulting
We share the order first (assessment, on-site check, presentation of terms, contract, construction) and make clear what happens next.
LANDOWNER / INSTALLATION FLOW
For landowners
All you need at first is the information you have, such as the location of the land. We explain what is checked at each stage, from the free assessment through the on-site check, contract and construction to operation.
There is no obligation to sign a contract at the consultation and assessment stage. Formal terms are presented in writing after surveys and discussions.
Installation proceeds in 6 steps, from your inquiry to the start of operation.
There is no obligation to sign a contract at the consultation and assessment stage, and you, the landowner, can decide at each stage.
Contract terms such as cost sharing and restoration to the original condition are set out for you individually in writing before the contract.
Before You Start
“What do I need to prepare?” “When do I sign the contract?” “What about the construction and the costs?” We have set out in advance what you will want to know before installation.
We share the order first (assessment, on-site check, presentation of terms, contract, construction) and make clear what happens next.
You do not need to gather every document from the start. At the stage they are needed, we tell you individually what to check and which documents to prepare.
Who bears what for equipment, construction, maintenance, and removal and restoration to the original condition is confirmed in the statement of terms and the contract before the formal contract.
6 Steps
Without rushing the contract, we proceed in stages while checking whether the land is suitable and what the terms are. The length of each step varies with the land conditions and the connection procedures.
* The above is the standard order of study. The order and details may change depending on the utility’s response, laws, regulations and local ordinances, the land conditions and the type of contract.
Details
We list separately what we ask of you as the landowner and what REVIX checks and arranges.
STEP 01
You can start with whatever information you have, such as the location and the area.
STEP 02
From map information, the surrounding conditions and so on, we check whether the land is a candidate site that can move on to the next survey.
STEP 03
On site, we check not only the equipment layout but also the delivery route, nearby homes and the construction conditions.
STEP 04
Before the contract, we confirm the scope of land use, the contract term, cost sharing, maintenance, removal and so on.
STEP 05
Taking the connection procedures and design conditions into account, we share the construction plan and then carry out the work.
STEP 06
After test operation and checks, the equipment goes into operation. Things then move on to the operation and maintenance stage, based on the land-use terms.
Responsibilities
When a land lease is considered, it is not assumed that you, the landowner, buy the equipment. However, cost sharing and restoration to the original condition differ with the land conditions and the type of contract, so we confirm them individually as formal terms.
| Item to check | Basic arrangement | Points to check before the contract |
|---|---|---|
| Equipment and construction | Assumes a land lease in which the operator designs and arranges them | Scope of costs, including grading, exterior work and ancillary work |
| Applications and procedures | The operator takes the lead in coordinating the related procedures | Where the owner’s consent, seal or documents are needed |
| Operation and maintenance | The structure for operating and maintaining the equipment is reflected in the contract terms | Site access for inspections, emergency contact and the scope of site management |
| Removal and restoration to the original condition | How the end of the contract is handled is written in the contract | What is removed, the level of restoration, cost sharing and timing |
* This table sets out items that are generally considered. It does not guarantee the contract terms of any individual project.
Preparation
The following information helps the assessment go smoothly. Even if you do not know some of the items, you can still consult us.
FREE SITE CHECK
Without assuming a contract, we set out a starting point for study from the location and the current condition. You can leave items you do not know blank.
FAQ
We have gathered questions often asked before a consultation. Individual conditions can be checked during the free assessment.
No. The first step is a free assessment to check the location, area and so on of the land. After reviewing the assessment results and the terms, you can decide whether to move on to the next stage.
The location, the approximate area, the current use, the ownership of the land and so on, as far as you know. We will tell you individually about documents such as the cadastral map and the certificate of registered matters at the stage they are needed.
It varies with the land conditions, the on-site survey, the connection procedures with the utility, the construction work and so on. We do not set a fixed period. After the survey, we explain the expected schedule.
In a land-lease proposal, the design of the equipment and the arrangement of the construction are assumed to be handled by the operator. Cost sharing and the division of roles are made clear in the proposal and the contract for each project.
We check the installation conditions and the surroundings, and consider individually the scope of explanation and coordination that is needed. Noise, safety, the delivery route and so on are also covered in the on-site check.
The scope of removal, the cost sharing and the standard for restoration to the original condition are confirmed in writing before the contract. Because they differ with how the land is used and the grading carried out, they are written down as individual terms rather than set uniformly.
It assumes a long-term land lease, and we may present 15 years as a reference term. However, the final contract term, including the survey period, the construction period, the operation period and the renewal terms, differs for each project. Be sure to confirm the start and end dates of the contract and the terms for renewal and extension in writing. * This does not mean that “rent for 15 years is guaranteed unconditionally.” The conditions precedent and the termination conditions also need to be checked.
Whether early termination is possible, penalties, equipment removal costs and liability for damages depend on the contract clauses. Because the project involves investment in equipment and grid applications, the contract may not allow the landowner to terminate it freely for their own reasons alone. Check the termination conditions in concrete terms before the contract. * Check not only the verbal explanation but also the termination clause, the damages clause and the force majeure clause in the contract.
START WITH A CHECK
Please tell us what you know, such as the location and the area. After checking the assessment results, you can decide whether to proceed.
* This does not guarantee the assessment results, profitability, whether connection is possible or that a contract will be concluded.