Area and shape
6 tsubo or more as a guide. We check whether the shape leaves room for the equipment, foundations and maintenance access.
* 6 tsubo is a guide. The final layout decides
LANDOWNER / SITE REQUIREMENTS
For landowners
Could your land be a candidate for low-voltage grid-scale battery storage (BESS)?
We set out the area, road frontage, current condition and rights in plain terms.
QUICK ANSWER
Not meeting all of them does not necessarily rule the land out.
For the initial assessment, it is enough to set out what you know.
6 tsubo or more as a guide. We check whether the shape leaves room for the equipment, foundations and maintenance access.
* 6 tsubo is a guide. The final layout decides
We check whether construction vehicles and the equipment can be brought in, looking at the road width, corners and differences in level.
* On-site photos make things go smoothly
We check slopes, soft ground, flooding risk, the position relative to nearby homes and so on.
* On-site survey as needed
We check individually the state of utility poles and distribution lines, the landowner, the land category, regulations and so on.
* Cannot be confirmed from appearance alone
Important: The checks on this page are an initial check. Whether installation is possible is decided individually after checking the on-site survey, the grid situation of the general transmission and distribution operator, laws, regulations and local ordinances, the contract terms and so on.
SITE REQUIREMENTS
Having enough area does not decide it on its own. We check in order, through the equipment layout, construction, operation and rights.
We check whether a layout is possible that includes not only the equipment itself but also the foundations, fences and access routes for inspection and maintenance.
We check whether vehicles and equipment can pass safely, looking at the road width, the entrance, corners, overhead wires, trees and so on.
Because these affect how difficult grading and foundation work will be, we check slopes, fill, muddy ground, drainage and so on.
Even if equipment is visible nearby, connection is not always possible. We check the available grid capacity and the construction conditions individually.
Checks that depend on the location are needed, such as farmland, forest land, development permits, landscape rules, and flooding or landslides.
We sort out early any matters that affect the contract term, such as co-ownership, mortgages, inheritance, and plans to sell or build.
COMMON PITFALLS
Even when the conditions look good, some items need to be checked later.
Long, narrow land or land with large differences in level may not have enough effective area. We check including the shape and the routes for construction.
Appearance alone does not tell you the available grid capacity or the construction conditions. An application to, and checks with, the general transmission and distribution operator are needed.
Whether the land can be used varies with the location and the plan. We check the lot number and the registered matters, and sort out the procedures needed.
FREE DIAGNOSIS
You do not need to research every unknown item yourself. We sort out whether the land can move on to the next check as a candidate site, and what additional information is needed.
DOCUMENTS
You do not need to gather everything from the start. A checklist by stage (first consultation → after the land becomes a candidate site → application and contract) is on a dedicated page.
Stage-by-stage checklist of required documentsSee what to submit, when and why, listed stage by stage
See the required documents page →NEXT STEPS
Please share information that shows where the land is, such as the address, the lot number or a map URL.
From photos and drawings, we make an initial check of the area, road frontage and surroundings.
We tell you the items to check next, such as the grid, laws and regulations, and rights.
If the land goes ahead as a candidate site, we move on to an on-site survey and preparing the required documents.
NOT A PERFECT MATCH?
Please consult us even while you still have open questions, such as “it is slightly short of 6 tsubo,” “it may be farmland” or “I do not know the distance to the utility pole.” How the checks proceed changes with the shape of the land and the surrounding conditions.
FAQ
We have gathered the points people often wonder about before deciding.
Yes. 6 tsubo is a guide for the initial check, and the decision varies with the shape of the land, the equipment layout, road frontage and the surroundings. We check case by case based on documents that show the location and the current condition.
It varies with the contract method and the project conditions. Please confirm the terms, including cost sharing, in the individual materials and the contract details after the candidate site assessment. This page does not state any unconfirmed cost terms as definite.
It cannot be decided uniformly by the land category alone. Checks on conversion, development, grading, related laws and regulations and so on may be needed, so we check case by case based on documents that show the lot number and the registered matters.
We check based on the equipment layout, the distance from the surroundings, the delivery route, the operating conditions and so on. Once the land becomes a candidate site, we consider safety measures and consideration for the neighbors individually according to the on-site conditions.
How it is handled differs with the contract details and the rights involved. If you plan to sell, please let us know at the time of the assessment, and confirm the terms before the contract.
The scope of restoration to the original condition and the cost sharing need to be made clear as contract terms. Based on the construction work for each candidate site, please confirm them in writing before the contract.
It can be considered if the equipment, maintenance access routes, fences and power receiving equipment can be laid out safely. Land with a narrow frontage, large differences in level, or no access for heavy machinery may need additional work or may not allow installation. Drawings or photos make the initial check easier. * Cost sharing and contract terms may change depending on grading and delivery conditions.
We consider it after checking the distance from homes, the boundary position, noise standards, and fire safety and building-related conditions. Where needed, we adjust the equipment layout, take soundproofing measures, plan fences and so on, but depending on the surroundings the land may not be suitable as a candidate site.
FREE SITE DIAGNOSIS
It is fine if your documents are not ready.
From whatever information you have, we sort out what should be checked next.
* The assessment does not guarantee that installation is possible or any revenue.