Creating success in grid-scale battery storage, together.

FOR INVESTORS & BUSINESS PARTNERS

Low-voltage BESS | For investors and business partners

From consultation to operation, an installation process with every decision point in view

We set out the viability estimate, contract, installation, grid connection and start of operation in 6 stages, and guide you clearly on “what to check and what to decide” at each stage.

* Whether installation is possible, the schedule and profitability differ with the site, grid, construction and market conditions.

6 stages from study to operation

You can check consultation, estimate, contract, installation, connection and operation as one continuous process.

Separate roles for the investor and REVIX

At each stage, we make clear what we ask of you and the scope of our support.

Managed with a schedule for each project

Taking into account changes caused by the utility and the construction conditions, we share progress using an individual schedule.

BEFORE YOU START

3 concerns to sort out before installation

What matters in an investment decision is not only the appeal of the equipment, but grasping the assumptions and the open items at an early stage.

A consultation reviewing materials on an investment plan for low-voltage grid-scale battery storage

01

At what point do you make the investment decision?

We separate the initial consultation, the rough estimate, the site and grid check, and fixing the contract terms, and add decision inputs at each stage.

02

Where can the timeline change?

We do not state a fixed period for stages that include external factors, such as grid connection, permits, materials procurement and construction conditions.

03

Who operates the system after it starts running?

Before the contract, we confirm market operation, equipment monitoring, maintenance and the contact structure for faults as a division of roles.

REVIX SUPPORT

Linking the investment decision to operation without splitting the process

We sort out the specialist information for each stage and move forward while putting it into a form that makes decisions easier for investors.

Sorting out the assumptions

At an early stage, we check the investment purpose, business scheme, site, funding plan and operating policy.

Making viability visible

We separate the assumptions for revenue, costs and operating conditions so that you can check the basis of the estimate and the factors that change it.

Moving design, construction and grid connection forward

Based on the schedule for each project, we bring the information on design, construction and grid connection together in one place.

Confirming roles after operation starts

We sort out the contact points and the scope of responsibility for equipment monitoring, maintenance, operation reports and fault response.

6-STEP PROCESS

The whole picture, from consultation to operation

First get a sense of the 6 stages, then check the decisions and the documents needed at each stage.

  1. 01 Consultation Sort out goals and conditions
  2. 02 Estimate Check viability
  3. 03 Contract Agree on terms and roles
  4. 04 Installation Carry out design and construction
  5. 05 Connection Complete connection and inspection
  6. 06 Operation Start operation and maintenance

About the timeline

The overall period changes with the site, the review and work by the general transmission and distribution operator, permits, materials procurement and construction conditions. After your consultation, we present an individual schedule based on the conditions we have been able to confirm.

STEP DETAILS

What to check at each step

We organize each stage as a set of 3 points: What we ask of youREVIX supportCriteria for moving on.

STEP 01

Consultation and assumptions

Confirm the investment purpose and the project conditions

What we ask of you

  • Sharing your investment purpose, assumed budget and preferred timing
  • Sharing whether you have a site, any plans to acquire one, and candidate site information
  • Sharing basic conditions, such as whether you are a corporation or an individual and how you will fund the project

REVIX support

  • Sorting out the scheme under study and the order of checks
  • Guidance on the information needed for the next estimate
  • Checking the consultation route that suits the project

Guide timingAfter the first interview, we guide you on the next items to check

Decision criteriaThe assumptions needed for the estimate have been sorted out

STEP 02

Viability estimate and condition check

Check not only revenue but also costs and the factors that change it

What we ask of you

  • Fixing the candidate site, the funding plan and the preferred scheme
  • Confirming the estimate assumptions and the acceptable risk
  • Answering items that need further investigation

REVIX support

  • Sorting out the assumptions for revenue, costs and operating conditions
  • Stating the open items and the sensitivity factors clearly
  • Sorting out the issues for moving on to the next survey or discussion

Guide timingPresented for each project after we receive the information needed

Decision criteriaYou understand the estimate assumptions, the factors that change it and the items for further investigation

STEP 03

Checking and signing the contract terms

Agree on costs, the scope of responsibility, and the shutdown and termination terms

What we ask of you

  • Confirming the contracting parties and the timing of funding
  • Checking the quotation, the contract terms and the payment terms
  • Checking with specialists as needed

REVIX support

  • Explaining the contract, the quotation and the schedule conditions
  • Sorting out the division of roles and the contact flow when changes occur
  • Confirming the conditions for moving on to the next stage

Guide timingSigned after the discussion of terms and the internal review are complete

Decision criteriaCosts, the scope of responsibility, risks and the conditions for changes have been agreed

A site where installation work on low-voltage grid-scale battery storage equipment is under way

STEP 04

Design, procurement and installation

Give shape to the equipment to suit the site conditions

What we ask of you

  • Arranging the site check and the construction schedule
  • Sharing additional conditions and circumstances in the surrounding area
  • Approving changes

REVIX support

  • Managing the progress of design, materials and the construction plan
  • Sharing the schedule, changes and issues
  • Coordinating inspections and preparation for grid connection

Guide timingPresented in a schedule after checking the site, materials and construction conditions

Decision criteriaThe completion conditions for design, construction and inspection are clear

STEP 05

Grid connection and inspection

Complete the connection to the power grid and the checks before operation

What we ask of you

  • Checking the information needed for applications and contracts
  • Deciding on additional costs or schedule changes
  • Final check before operation

REVIX support

  • Sorting out the procedures needed with the general T&D operator
  • Managing inspections, test runs and corrective items
  • Confirming the conditions for starting operation

Guide timingVaries with the review, work and inspection conditions

Decision criteriaThe conditions for grid connection, test runs and the start of operation are met

STEP 06

Start of operation, operation and maintenance

Continue the business while checking how it is operating

What we ask of you

  • Checking operation reports and income and expense information
  • Deciding on maintenance, renewal and additional work
  • Updating contact and approver information

REVIX support

  • Sharing information based on the operation and maintenance structure
  • Contact and sorting out the response when faults or shutdowns occur
  • Improvement and renewal proposals according to the scope of the contract

Guide timingStarts after grid connection and preparation for operation are complete

Decision criteriaThe structure for monitoring, maintenance, reporting and fault response is in place

APPLICATION COST

We publish the process and the costs of the grid application (the connection application to the utility)

See the application costs →

START WITH FEASIBILITY

Why not start by sorting out the assumptions an investment decision needs?

It is fine even if you have not decided whether you have a site or what stage of study you are at. From your current conditions, we guide you on the items to check next.

DOCUMENT GUIDE

The main documents we may ask you to prepare

For the first consultation, the information you have to hand is enough. A checklist for each stage of the process is gathered on a dedicated page.

The initial consultation starts from “location, current condition and approximate area” Documents for the contract, grid connection and operation stages are explained individually for each project

Document checklist by stageYou can see in a list, stage by stage, what to submit, when and why

See the documents page →

DECISION GATES

4 decision points to check before the contract

It is important to check not only the size of the revenue but also the conditions for viability, the factors that change it and the scope of responsibility, as a set.

GATE 01

Site and installation conditions

We check physical and legal conditions, such as the area, delivery access, foundations, the surrounding environment and the rights to the land.

GATE 02

Grid and schedule conditions

We check the impact of external conditions, such as the connection procedures, the construction cost, inspections and the timing of grid connection.

GATE 03

Revenue and cost assumptions

We check separately the assumptions for expected sales, operating conditions, equipment, construction and maintenance costs, and the cost of capital.

GATE 04

Operation and response to shutdowns

We check monitoring, maintenance, faults, long-term shutdowns, contract changes and how things are handled at the end of the contract.

A revenue estimate does not guarantee future revenue.

Actual results may differ from the estimate due to market prices, regulations, operating status, equipment performance, downtime periods, costs, financing terms and other factors. Before the contract, please check the estimate conditions and the explanation of risks.

A maintenance staff member checking low-voltage grid-scale battery storage equipment after the start of operation

AFTER COMMISSIONING

The start of operation is where running the business begins

After the start of operation, the business continues while information on the equipment, operation and income and expenses is checked, based on the structure set out in the contract.

Sharing the operating status

We sort out the reporting items, their frequency and how to check them, according to the scope of the contract.

Maintenance and fault response

We confirm the contacts, the first response, and the roles in repair and recovery when something abnormal happens or the system stops.

Decisions on review and renewal

We consider the response needed as the markets, regulations and the condition of the equipment change.

FAQ

Frequently asked questions about the installation process

Do I need to fix the site and budget before consulting you?

You can consult us even if they are not fixed. We ask about what you know, such as the purpose of your study, whether you have a site and your assumed budget, and guide you on the items to check next.

How long does it take from inquiry to operation?

We cannot set a uniform period. Because it changes with conditions such as the site, grid connection, permits, materials, construction and inspections, we present an individual schedule after checking the project conditions.

Are the figures in the revenue estimate guaranteed?

No, they are not guaranteed. Actual results vary with market prices, regulations, operating status, equipment performance, downtime, costs, financing terms and other factors. When you receive an estimate, please check the assumptions and the risks.

At which stage do costs arise?

It differs with the contract details, such as consultation, survey, contract, and design and construction. The stages at which costs arise, the amounts and the payment terms are explained in the quotation and the contract before work starts.

Can grid connection make the schedule longer?

Yes. The schedule may change due to the review by the general T&D operator, additional work, the content of its response, the timing of the work and other factors. Any changes that become clear are reflected in the schedule.

What happens if the design or costs change after the contract?

Changes may become necessary due to site, grid or construction conditions. We explain the reason for the change, its impact, any additional costs and the schedule, and confirm them following the procedures in the contract.

Who handles monitoring and maintenance after operation starts?

It depends on the operation and maintenance scheme adopted and the scope of the contract. Before the contract, we sort out the roles for monitoring, periodic inspections, fault response, reporting and cost sharing.

YOUR NEXT STEP

We sort out your next step to match your stage of study.

Tell us where you are now, such as “I want to know whether it works as an investment” or “I want to start by checking a candidate site.” We will guide you on the documents needed and the order of checks.

Depending on what you tell us, a representative will guide you on the items to check.