Creating success in grid-scale battery storage, together.

LOW-VOLTAGE BESS / INVESTOR

It is fine before your documents are ready.

Required Documents Guide for Investors

At the early stage, sorting out “where, at what scale, roughly when and who wants to go ahead” comes before perfect application documents. We have listed the documents needed at each stage of the study.

Key points on this page

  • An initial consultation can start with the location, lot number, map and on-site photos.
  • As the study progresses, documents on the equipment specifications, the grid and the rights are gathered step by step.
  • We advise individually on the formal requirements and the documents to submit, depending on the general transmission and distribution operator, the municipality, the equipment specifications and the contract scheme.

CHECKLIST

Required documents checklist by stage

Listed in the order they are needed. You can start a consultation with the first STEP alone

STEP 1

Initial consultation

You can start consulting from this stage
  • Location, lot number and mapThis is all you need Used to identify the site
  • On-site photos and the surroundings For the first check. Information on a survey drawing, existing equipment, the road and the incoming line route makes it easier to move forward
STEP 2

Study and design

Once the study of the candidate site and the plan moves forward
  • Specification documents for the batteries, PCS and protection devices Used to check the equipment plan
  • Documents on the connection point, the incoming line route and the construction conditions Used to study the grid and the construction work
STEP 3

Contracts and rights

When moving on to the contract procedures
  • Documents showing the land rights and the consent to use the land Used to check the site
  • Documents confirming the corporation and the signing authority Needed for the contract procedures
STEP 4

Construction and electrical safety

When preparing to start construction
  • Detailed design, foundation and construction drawings Used to prepare for construction
  • Documents on electrical safety, fire prevention and upkeep Used to check the electrical safety structure

* The required documents vary with the location of the land, the type of contract, the general transmission and distribution operator, administrative procedures and so on. The above is an example of an initial overview, and we advise on the formal documents to submit case by case.
For the conditions themselves, such as area and road frontage, see the site requirements (site, grid and equipment).

You can consult us before your documents are ready

You do not need to gather everything from the start. The document names and any additional documents change with the application destination, the equipment specifications and the type of contract, so we proceed while checking what is needed at each stage.

FAQ

Frequently asked questions

On preparing documents

Can I consult you before my documents are ready?
Yes, that is fine. At the early stage, the first step is to sort out "where, at what scale, roughly when and who wants to go ahead." If on-site photos, a map, the lot number and the status of the rights are known, it becomes easier to separate out the surveys needed next.
Which documents should I obtain first?
Start with the location, lot number, map and on-site photos. After that, as the study progresses, we sort out the missing documents, priority surveys and next procedures for you individually.

Start by consulting us about the site and an outline of your plan

With the location, lot number, map and on-site photos, we can separate out the surveys needed next.

Consult us with just the site information first →

Published: August 9, 2026 / Last updated: August 9, 2026 | Basis for the content: based on the information on the Site Requirements & Documents page