Creating success in grid-scale battery storage, together.

Low-voltage BESS | For investors and business partners

Making the assumptions behind an investment decision visible. Equipment from 12.5 million yen

We check how revenue works, the assumed conditions, the risks and the operating structure one by one, and estimate the potential of a low-voltage battery investment for your individual case.

Expected yield (not guaranteed) 19% approx.*
Guide installation area (approx.) 6tsubo and up*

* The figures shown are estimates based on certain assumptions and do not guarantee revenue or yield. They vary with the equipment specifications, grid connection, construction costs, market prices, availability, operating costs and other factors.

White low-voltage grid-scale battery storage units installed in neat rows in a Japanese suburb

The price and expected yield (not guaranteed) on this page are estimates for the GoodWe 49.9 kW / 100 kWh Package. The price and expected yield of the new product RENON 49.9kW / 133kWh are shown on the RENON page.

Close-up of the exterior of a low-voltage grid-scale battery storage cabinet and its foundation

The starting point for an investment decision is to check not just the yield figure but the conditions under which that figure holds.

Before investing

“Looks profitable” is not enough to decide.

In a low-voltage battery investment, you need to check the source of revenue, the operation of the equipment, grid connection, maintenance and the exit as one business.

  • What assumptions is the expected yield calculated on?

    We break down the estimate conditions and check them: market unit prices, availability, equipment costs, operating costs, insurance and tax, and so on.

  • Will the site and the grid connection really work?

    The land conditions and the utility’s connection conditions decide whether a project goes ahead. Each candidate site needs to be checked.

  • How will you prepare for operation, faults and downtime after start-up?

    We check monitoring, maintenance, warranty, insurance and the scope of response during downtime before the contract, and reflect them in the income and expenses.

Investment highlights

Put business design unique to low voltage to work in your investment decision.

We combine the ease of keeping each project small with the idea of distributed placement, and study the design of the projects as a whole.

01

A study range starting with equipment from 12.5 million yen

It is easier to compare options in smaller units than with large projects, and you can plan combinations that fit your investment policy.

02

Distributed sites that can be considered from about 6 tsubo

Designs that widen the choice of candidate sites, such as part of an existing facility or a solar power plant, are possible.

03

Revenue opportunities based on market operation

We study the use of the markets according to the operating policy, such as grid balancing and power trading.

04

Seeing ahead from project formation to operation

We check not only the equipment but also the site, grid connection, construction, aggregation and maintenance as one continuous process.

On-site scene illustrating the power grid and the operation of low-voltage battery equipment

Revenue mechanism

Operation that supports the power supply-demand balance leads to revenue opportunities.

Unlike a home battery, it is assumed to connect to the grid and be used in the power markets through operation by an aggregator or similar.

Understand the supply-demand situation on the grid

An operating plan is built based on power shortages and surpluses and on market prices.

Charge, discharge and standby operation of the battery

The battery charges, discharges and stands by to respond, in line with the condition of the equipment and the market requirements.

Business income and expenses built from market revenue

Income and expenses are checked by deducting operating and maintenance costs from revenue from balancing, wholesale power and other sources.

See how revenue works in detail

Simulation

Reading the expected yield around 19% (not guaranteed) from its assumptions.

This is a reference model with equipment from 12.5 million yen. The figures shown are a guide for the start of your study. A formal investment decision needs an individual estimate that reflects the costs and revenue conditions of the specific project.

Does the total investment include grading, grid connection and the grid connection construction cost? Does it include maintenance, insurance, communications and tax costs? Are availability, degradation and downtime viewed conservatively? Does it also factor in a downside in market prices?

Low-Voltage Simulator (main page)Estimates with your assumptions entered, sensitivity analysis and the way to the cost breakdown are all gathered here

Estimate with your own conditions →
Aerial view of a Japanese suburb showing solar power equipment and candidate sites for low-voltage batteries
Guide installation area About 6 tsubo

Site strategy

Widening the choice of sites, the entry point to an investment project.

Making use of the compact size of low-voltage equipment, we study distributed project formation that does not depend on a single large site.

  1. 01

    Making unused land or part of a facility’s grounds a candidate

    We check the area needed, delivery access, noise, clearances, ownership and connection conditions.

  2. 02

    Partly replacing existing solar is also studied case by case

    We compare the reduced generation income with land rent and other income, and check whether it makes sense for the owner.

  3. 03

    Portfolio design that bundles several projects

    We spread the region, connection timing and equipment condition, and keep track of where each project is skewed.

Risk & control

Check the risks in the same detail as the expected revenue.

We sort out the main items to check before an investment decision and reflect them in the estimate, the contract and operation.

MARKET

Market prices and regulatory change

Allowing for price falls and changes to participation requirements, we check income and expenses that do not rely on a single scenario.

GRID

Grid connection and construction period

We check how whether connection is possible, the grid connection construction cost, the timing of the utility’s response and construction delays affect the start of the business.

OPERATION

Availability and downtime losses

We factor faults, communication failures, output restrictions and maintenance shutdowns into the revenue estimate.

ASSET

Degradation, repairs and warranty

We check capacity degradation, replacement costs, warranty terms and the parts supply period.

SITE

Site and neighborhood

We check land rights, hazards, the delivery route, noise and the distance to nearby facilities.

EXIT

Contracts and exit strategy

Before the contract, we sort out transfer restrictions, termination terms, equipment removal and the possibility of a sale.

START WITH THE ASSUMPTIONS

Start by getting the assumptions of the project in order.

We ask about your investment policy, preferred scale, whether you have a candidate site and the holding period, and sort out the points to check and the information needed for an estimate.

An investor and a representative reviewing materials on a low-voltage battery project at a consultation

Process

The process from study to operation.

We gather the information for decisions at an early stage and check the viability of the project step by step.

  1. STEP 01

    Inquiry

    Share your investment policy, budget and whether you have a candidate site.

  2. STEP 02

    Project overview and document check

    Check the assumed scheme and the main conditions.

  3. STEP 03

    Individual estimate

    Sort out costs, revenue, sensitivity and the payback outlook.

  4. STEP 04

    Due diligence

    Check the site, grid connection, equipment and contract risks.

  5. STEP 05

    Contract and construction

    Once the terms are fixed, move on to procurement, applications and construction.

  6. STEP 06

    Operation and reporting

    Check the operating status and revenue, and improve operation.

Decision checklist

Sorting these out before you request materials makes the estimate more concrete.

It is fine if they are not settled yet. Please share your study conditions as far as you know them.

Exterior of low-voltage grid-scale battery storage equipment showing the points to check
  • Investment budget and preferred investment unit

    We sort out the scale you have in mind: a single project, several projects, a joint investment and so on.

  • Preferred holding period and exit policy

    We check your priorities: long-term holding, selling partway, business transfer and so on.

  • Whether you have a candidate site or existing assets

    Share land you own, existing solar, sites of partner companies and so on.

  • Acceptable risk and expected return

    We check how you view market fluctuations, the construction period, availability and the payback period.

  • Internal documents needed and the decision-making process

    We sort out the documents needed for internal approval, an investment committee and explanations to financial institutions.

FAQ

Frequently asked questions

We have gathered the questions we often receive at the early stage of an investment decision.

Is the expected yield of around 19% guaranteed?

No, it is not guaranteed. It is an estimated figure that varies with assumptions such as market prices, availability, operating costs and connection conditions. For an individual project, please check a revenue estimate with its assumptions clearly stated.

What does the equipment cost of 12.5 million yen include?

The amount shown is a guide for the start of your study. The scope of the equipment configuration, grading, grid connection, grid connection construction cost, insurance, maintenance and so on differs by project, so it is confirmed in a formal quotation.

Which markets does the revenue come from?

Use in the balancing market, the wholesale power market and others is assumed, but the way of taking part and the revenue mix differ with the rules, the aggregator and the operating policy.

Can I consult you even if I do not have a candidate site?

Yes, you can. Depending on the status of the project and the offering terms, we explain how to think about candidate sites and the items to check. We do not guarantee that a site will be secured.

How should I think about the risk of faults and downtime?

It is important to check in advance the downtime, repair costs, warranty scope, insurance and alternative arrangements, and to set availability and maintenance costs conservatively in the revenue estimate.

Is an exit strategy or a sale possible?

It depends on the contract structure and the business scheme. Please check the options, such as transferring your equity interest, selling the equipment or continuing to hold it, and their constraints before signing the contract.

Do I have to sign a contract after requesting materials?

There is no obligation to sign a contract at the stage of requesting materials or the first consultation. Please start by checking the assumptions and the study process.

A representative checking a candidate installation site for low-voltage grid-scale battery storage

NEXT STEP

Check what lies behind the numbers before you move on.

We give you the revenue estimate, the project overview and the documents needed all together. You can consult us at an early stage of your study, even if your candidate site is not yet decided.