Creating success in grid-scale battery storage, together.

HIGH-VOLTAGE BESS / INVESTMENT PROCESS

For corporate investors and operators

High-Voltage Grid-Scale Battery Storage
The Process to Deployment

From the site check to grid connection and operation.
We split a complex process into 7 steps, so the next decision you need to make is clear.

What this page tells you

  • The whole picture, from the first review to operation
  • The decisions and documents each step needs
  • The main factors that change the timeline and the cost

WHY THE PROCESS MATTERS

A high-voltage BESS does not begin
simply by placing the equipment.

Land, grid, design, contract, construction and operation all depend on each other. Sorting out the issues early, and getting ahead of the points where projects tend to stall, makes your business decision more accurate.

01

Land alone is not enough to decide

Beyond the area and road frontage, we check the surroundings, the site grading conditions, the rights to the land and whether the equipment layout actually works.

02

Grid conditions change the process

The answers to the connection review and the contract application can change the assumptions for the scope of work, the schedule and the cost.

03

The investment decision runs through to operation design

A plan only becomes workable once you can see through to the monitoring, maintenance, contact structure and contract terms that apply after the equipment is completed.

7 STEPS

The whole picture, from the first review to operation

Some stages run in parallel on each project, but dividing the order of decisions into 7 makes it easier to see where you are and what comes next.

  1. 01 FEASIBILITY Site check Location, rights, layout conditions
  2. 02 FEASIBILITY Initial assessment Sorting out the viability issues
  3. 03 PLANNING Design Specifications, layout, revenue assumptions
  4. 04 DECISION Contract Terms, roles and scope fixed
  5. 05 EXECUTION Construction Procurement, grading, installation
  6. 06 COMMISSIONING Grid connection Testing, checks, start of operation
  7. 07 OPERATION Operation Monitoring, maintenance, improvement

* The stages, the required procedures and their order differ with the equipment scale, the connection point, the site conditions, the contract structure and more.

PROCESS DETAIL

What is checked at each step

We separate the decisions made on the investor or operator side from the practical work REVIX supports.

An engineer checking a candidate site for high-voltage grid-scale battery storage on the ground

PHASE 1 / FEASIBILITY

Narrow down the conditions for a viable project at an early stage

STEP 01

Site check

We check the location, area, shape, road frontage, surroundings and the rights to the land, and sort out the assumptions for the equipment layout and the construction.

What you prepare
Documents showing the location, the land area and shape, current photos, rights documents and so on
Decision points
Whether the layout works, delivery routes, grading conditions, consideration for the neighbors

STEP 02

Initial assessment

We identify the issues across the land, the grid, the equipment and the business scheme, and set out the conditions for moving on to the next survey or study.

REVIX's support
Initial hearing, sorting out the issues, listing the additional items to check
What you receive
A list of study conditions, risk items and the inputs for the next decision
A corporate representative and an engineer reviewing the layout plan for high-voltage grid-scale battery storage

PHASE 2 / PLANNING & DECISION

Make the specifications and roles concrete, and lead into the investment decision

STEP 03

Design

We sort out the equipment configuration, the layout, the substation and connection equipment, monitoring and communications, the scope of work and more, and make the assumptions behind the business plan concrete.

What we check
Equipment specifications, layout plan, operating requirements, related procedures
Variable factors
Grid conditions, scope of work, equipment procurement, permits and consultations

STEP 04

Contract

We confirm the costs, payment terms, demarcation of responsibility, schedule, scope of warranty and maintenance, and the assumptions, and reflect what has been agreed in the contract.

The investor's decisions
Business plan, funding plan, risk allocation, contract terms
Key point
Put the undecided conditions, and how changes are handled, in writing
An engineer checking the installation progress at a construction site for high-voltage grid-scale battery storage

PHASE 3 / EXECUTION & COMMISSIONING

Confirm the construction quality and connection conditions, and move to the start of operation

STEP 05

Construction

Based on the detailed design, we proceed with equipment procurement, grading, foundations, electrical work, equipment installation and the set-up of the communications and monitoring environment.

Management items
Schedule, safety, quality, change management, coordination among the parties
Documents to check
Construction plan, inspection records, as-built documents, operating manuals and so on

STEP 06

Grid connection and commissioning

We carry out the procedures with the general transmission and distribution operator and others, and run the required tests and checks. Once the connection conditions are in place, we move to the start of operation.

Note
Connection is not confirmed by a preliminary consultation or a connection review alone
Completion checks
Test results, settings, operating procedures, contact structure

PHASE 4 / OPERATION

STEP 07

After operation starts, we keep watching the equipment and the business

Operational monitoring, periodic inspections, fault response, reporting and improvement continue. The specific scope of maintenance, warranty and monitoring is set for each project, based on the equipment adopted and the contract terms.

  • Checking the operating status and alerts
  • Periodic inspections and the maintenance plan
  • Contact and recovery procedures for faults
  • Reviewing the operating results and improving
An operations staff member monitoring the operating status of high-voltage grid-scale battery storage

ONE-STOP SUPPORT

Fewer gaps between stages,
and one thread of decision inputs.

With a high-voltage BESS, the people in charge of technology, contract, construction and operation are easily split up, and a mismatch in assumptions leads to rework later on. REVIX organizes a single point of contact for the project and supports the coordination with the specialists and parties involved.

Sorting out the viability issues

We bring the assumptions on land, grid, equipment, contract and operation together in one review sheet.

Linking design and construction

We share the design intent and the scope of work, and check how any change affects the business plan.

Coordination with the parties involved

We sort out the items to confirm with the general T&D operator, the construction company, the equipment suppliers and others.

Clear operating conditions

We get the scope of monitoring, maintenance, warranty and fault response into a state you can confirm before the contract.

APPLICATION COST

We publish the process and the costs of the grid application (the connection application to the utility)

See the application costs →

START WITH YOUR CURRENT INFORMATION

Even before your documents are complete,
we can sort things out from where you are.

Tell us what you know, such as the location and the scale you have in mind. We will sort out what needs checking next and how to proceed.

DECISION GATES

Where the timeline, costs and documents become concrete

Rather than fixing everything at the start, we raise the accuracy of the information stage by stage.

Decision stage What mainly becomes clear Documents often needed Variable factors
Initial consultation and site check Whether to continue the study, items for further investigation Location, land area and shape, current photos, rights Land conditions, delivery, surroundings, rights
Initial assessment and basic design Equipment configuration, rough conditions, main risks Planned scale, operating requirements, grid and equipment assumptions Equipment specifications, grid conditions, permits, scope of work
Contract and detailed design Costs, schedule, roles, contract terms Design documents, quotations, draft contract, schedule Equipment procurement, grid connection construction cost, change conditions, consultations with the parties
Construction, connection and preparation for operation Completion conditions, testing, operation and maintenance structure Construction and inspection records, as-built documents, operating procedures Construction progress, test results, connection conditions, operation contract
About the timeline

Because it differs greatly with conditions such as the connection review, the contract application, the construction and equipment procurement, we do not show a fixed timeline. We present the schedule after sorting out the assumptions for each project.

FAQ

Frequently asked questions
about the installation process

Where the answer depends on the project conditions, we sort out the items to confirm at the first consultation.

See all high-voltage BESS FAQs
QWhat are the steps from the first consultation to the start of operation?
A

We work through 7 basic steps: site check, initial assessment, design, contract, construction, grid connection and operation. In practice some stages may run in parallel, and we also adjust the order to the project conditions.

QHow long does it take until the business starts?
A

It varies a great deal with the site conditions, the review of grid connection, permits, equipment procurement, the scope of work and more. After the initial assessment we sort out the assumptions and the schedule, and give you a guide for your project.

QAre there documents I need for the first consultation?
A

Documents showing the location, the land area and shape, current photos, and the rights to the land all help the review move forward. You can still consult us before the documents are complete.

QIs grid connection confirmed once I consult you?
A

It is not confirmed by an initial consultation or a connection review alone. It is confirmed through the set procedures with the general transmission and distribution operator and others, such as the connection approval that follows the contract application.

QWhen will I know the costs?
A

At the early stage we sort out rough conditions, and the accuracy improves once the design, the answer on grid connection, the equipment specifications and the scope of work become concrete. Some costs change with conditions set by third parties.

QCan I also consult you about operation and maintenance after construction?
A

For each project we sort out the support needed after operation starts, such as operational monitoring, maintenance and the contact structure for faults. The specific scope and the warranty terms are confirmed before the contract.

QCan I consult you when only the land has been decided?
A

Yes. We check the location, area, road frontage and surroundings, and sort out what to look into next. It is not an assessment that guarantees a viable project, but a check that gathers the inputs for an initial decision.

FROM LAND TO OPERATION

Start with the conditions you know today.

We ask about your stage of review, whether you have land, and the scale you expect, and sort out what to confirm next. Depending on what you tell us, we guide you on the documents you need and how to proceed.

* A consultation or assessment does not guarantee a viable project, grid connection or revenue.