The basis for the yield
is hard to see
Without knowing the assumptions used in the estimate, such as market unit prices, availability, costs and the degradation rate, you cannot compare.
For low-voltage BESS investors
From expected yield (not guaranteed), equipment costs and operating risks to warranty and exit strategy. We have set out the points you will want to check before considering an investment in low-voltage grid-scale battery storage (BESS).
The price and expected yield (not guaranteed) on this page are estimates for the GoodWe 49.9 kW / 100 kWh Package. The price and expected yield of the new product RENON 49.9kW / 133kWh are shown on the RENON page.
Before investing
What you need to check are the assumptions behind the estimate, the conditions under which revenue falls short, and the structure for keeping operation going. The FAQ explains these 3 separately.
Without knowing the assumptions used in the estimate, such as market unit prices, availability, costs and the degradation rate, you cannot compare.
The effect of downtime, the maintenance scope and the contract terms on revenue needs to be made visible before investing.
Only when monitoring, the aggregator, the recovery contact point, insurance and the exit strategy are all included can it be judged as an investment product.
We do not mix confirmed information, conditional answers and items to check individually.
REVIX ANSWER STANDARD
Rather than giving the same statement on yield or warranty to everyone, we provide information at a consistent level of detail that you can base a decision on.
Content that can be checked against supporting documents, such as product specifications, contracts, formal quotations and published schemes.
Revenue estimates, schedules and operating conditions based on certain assumptions. We state the assumptions and the factors that cause variation alongside them.
Content that needs checking for the project, in the contract or with specialists, such as connection, location, financing, tax, insurance and transfer.
Decision guide
We aim for a state where you can compare not only the yield on the surface but also the downside conditions and operating responsibilities in the same documents.
We separate the initial investment, revenue assumptions, operating costs, degradation, downtime, removal costs and so on, and check the effect when they change.
We sort out the work included, costs charged separately, what the warranty covers, the recovery contact point and the conditions under which additional costs arise.
We check in advance the risks of connection, location, noise, security, faults, the market, regulations, financing and sale.
* The expected yield (not guaranteed), equipment price, start of operation and warranty terms change with the project conditions. Please check the formal quotation, the contract and the individual estimate.
FREE CONSULTATION
We ask about your land, funding plan and preferred operation, and sort out the items to check for an estimate. You do not need to decide on a purchase at the consultation stage.
Discuss an individual revenue estimateFrequently asked questions
For items that cannot be stated definitely at the time of answering, we show who to check with and what to check.
The assumptions behind the expected yield around 19% (not guaranteed), which markets the revenue comes from, and the exit strategy are answered on the Low-Voltage Simulator page.
See the Low-Voltage Simulator FAQ Questions about costs and pricesWhat the equipment cost of 12.5 million yen includes, the differences between plans, and the costs when using financing are answered on the Costs & Fees page.
See the FAQ on the costs page Questions about how revenue works and degradationMonthly changes in revenue, the effect of faults and downtime, and how to think about battery degradation are answered on the How Revenue Works page.
See the FAQ on how revenue works Questions about timelines and the processHow long it takes from application to the start of operation, when costs arise, and the grid connection process are answered on the Installation Process page.
See the installation process FAQ Questions about risks and guaranteesHow to think about revenue guarantees, downtime and downside factors, and sensitivity analysis are answered on the Risks page.
See the FAQ on the risks pageWe can provide the equipment information and revenue estimate materials needed to sort out a project, but financing decisions, tax treatment and accounting treatment need to be checked by specialists such as financial institutions and tax accountants. For insurance too, we check the scope of cover, the exclusions and how business interruption losses are handled, case by case.
RISK REVIEW
When you look at it as an investment product, the equipment specifications alone do not complete the picture. It is important to sort out who is responsible for what during the contract term.
START WITH QUESTIONS
It is fine if your land, budget or preferred timing are not yet decided. We sort out the items to check for an individual estimate and what can be judged at this point.
Expected revenue does not guarantee future results. Before signing a contract, please check the formal quotation, the contract terms and the risks.