In a low-voltage investment decision, misunderstandings arise less from the price itself than from “what that price includes.” Using the same cost breakdown as the Low-Voltage Simulator, we explain how to read a quotation.

Key points on this page

  • The equipment cost from 12.5 million yen is a reference price for the design, equipment and construction cost, excluding the land.
  • You can choose from 3 plans: “5-year warranty / 100kWh,” “15-year warranty / 100kWh” and “15-year warranty / 200kWh.”
  • For costs that depend on the on-site conditions (grid connection work, foundations and grading, delivery, applications, insurance, etc.), the breakdown is confirmed in a formal quotation.

The price and expected yield (not guaranteed) on this page are estimates for the GoodWe 49.9 kW / 100 kWh Package. The price and expected yield of the new product RENON 49.9kW / 133kWh are shown on the RENON page.

COST STRUCTURE

Cost structure

The same breakdown as the estimate in the Low-Voltage Simulator

Design, equipment and construction cost

A reference price for the complete system, excluding the land. From 12.5 million yen for the 5-year warranty / 49.9kW / 100kWh plan. Switching the plan changes the default value.

Land cost

If the land is acquired by purchase, its acquisition cost is considered separately; if the land is leased, the rent is. You can enter the land conditions and run an estimate in the Low-Voltage Simulator.

Costs that vary with on-site conditions

The scope of grid connection work, foundations and grading, delivery, applications, insurance, maintenance, aggregation and so on differs by project, so the breakdown is confirmed in a formal quotation.

Differences between plans

The price and the assumptions change with the combination of warranty period (5 years / 15 years) and capacity (100kWh / 200kWh). Where prices are shown side by side, check the warranty period and the price as a set.

TABLE

What is included, what is not

The figures and categories follow the Low-Voltage Simulator currently published

ItemIncluded in the reference price from 12.5 million yenNot included (separate, checked individually)
EquipmentDesign, equipment and construction cost (complete system)Additions due to on-site conditions (grid connection work, foundations and grading, delivery, etc.)
Land—Land acquisition cost or rent, and taxes on the land
Operation—Insurance, maintenance, aggregation, etc. (the scope is checked for each project)

* The 12.5 million yen is a reference price for the design, equipment and construction cost, excluding the land (details of tax and conditions are confirmed in a formal quotation). The price and expected yield (not guaranteed) are reference values based on our estimates and do not guarantee revenue or conditions.
Go to the Low-Voltage Simulator (estimate form with plan selection).

FAQ

Frequently asked questions

About the assumptions and how to check them

What does the equipment cost of 12.5 million yen include?
The 12.5 million yen is a reference price for the design, equipment and construction cost, excluding the land. The scope of on-site conditions, grid connection work, foundations and grading, delivery, applications, insurance, maintenance, aggregation and so on differs by project, so the breakdown is confirmed in a formal quotation.
What changes between plans?
The warranty period (5 years / 15 years) and the capacity (100kWh / 200kWh) change, and the default design, equipment and construction cost and the revenue assumptions change accordingly. You can switch plans and run an estimate in the Low-Voltage Simulator.
Can I also check the costs when using a loan?
Yes. Cash flow that reflects the loan amount, interest rate, repayment period, grace period and so on is checked in an individual estimate. This does not guarantee the review results or the loan terms of a financial institution.

Once you know what is included, run an estimate on your own conditions

Enter a plan and your land conditions to check the yield and the payback outlook.

Choose a plan and run an estimate →

Published: August 9, 2026 / Last updated: August 9, 2026 | Basis for the figures shown: the conditions published in the Low-Voltage Simulator