HIGH-VOLTAGE BESS / REVENUE MODEL

For corporate investors and businesses

High-Voltage Grid-Scale Battery Storage
Nippachi Simulator

Check viability on the assumptions of each project, with the revenue sources, costs, degradation and operating conditions kept separate. The variable factors needed for the decision are made visible as well.

* This page does not guarantee revenue or yield. Actual estimates differ with the conditions of each project.

CHECK POINT

  • 01The battery storage used and its strengths
  • 02Revenue simulator with actual figures
  • 03Downside sensitivity analysis

BATTERY SYSTEM

Maintenance by Tokyo Densetsu Service.Estimate with TDS×NEXTES battery storage.

The estimates on this page assume the use of the NEXTES container-type battery system, whose quality has been checked by Tokyo Densetsu Service (TDS).

TDS×NEXTES Container-Type Battery System CE007
Container-Type Battery System CE007
Battery used
Container-type battery systemModel CE007
Cell type
LFP (lithium iron phosphate)
System configuration
Rated 2,083kWh × 4 units8,332kWh in total
Output
1,990kW

SAFETY

KHK-certified fire-resistant enclosure

A fire-resistant enclosure that holds up well in fire department consultations. It is easier to install even in urbanization control areas, and keeps variation in permits and the construction period to a minimum.

LONG LIFE

Long life with patented balance control

Patented ACB + AMB control constantly corrects the variation between cells (balancing capability about 10 times that of conventional systems). Operation continues without stopping even if there are degraded cells.

SECURITY

JC-STAR★1 obtained for all equipment

The conformity label for control system security operated by IPA has been obtained for the equipment as a whole. It can also be presented where schemes and public solicitation guidelines call for it.

WARRANTY

Maintenance and warranty
by Tokyo Densetsu Service

Responsibility and the point of contact are brought into one, handling everything from identifying the cause to arranging recovery. The capacity warranty is 20 years as standard for grid-scale use.

* Product specifications and warranty terms differ with the contract. For details, see the NEXTES product page.

REVENUE SIMULATOR

Enter your land conditions and land rights cost
to estimate the payback outlook

On the equipment conditions (1,990kW / 8,332kWh, container type), enter the land conditions and land rights cost to calculate the yield.

Nippachi SimulatorA revenue estimate only for the 2MW/8MWh class (1,990kW)Estimated for the TEPCO service areaCalculated with conservative assumed unit prices of Type A 3.28 yen and Type B 6.40 yen (both per ΔkW per 30 minutes)

Input conditions
Equipment conditions
1,990kW / 8,332kWh
Evaluation period
20 years

The above are fixed assumptions. Changes for market and operating conditions are handled in an individual estimate.

RESULT

Estimate based on your input conditions

Total investment 640,280,000 yen
Expected yield (not guaranteed; 20-year average, pre-tax) 22.5%
Annual net cash flow (20-year average) 144,070,000 yen
Simple payback period 4.4 years
Cumulative cash flow over the 20-year evaluation period 2,881,480,000 yen Assumed values based on set assumptions; not a guarantee
  • *1. The yield is calculated as the 20-year average of "(annual sales − annual operating costs) ÷ total investment".
  • *2. The assumed unit prices in the balancing market are Type B 6.40 yen/ΔkW per 30 min and Type A 3.28 yen/ΔkW per 30 min.

SENSITIVITY

Look at the downside first,
not just the base case.

Rather than moving revenue, cost and degradation all at once, checking the factors one at a time shows which conditions to examine first. The simple yields below update with the inputs in the revenue estimate above.

DOWNSIDE

Revenue −15%

Simple yield 17.8%

Assume lower prices, cleared volumes and operation, and check the room for repayment and whether additional funds are needed.

BASE

Base conditions

Simple yield 22.5%

Built only from assumptions whose basis can be checked. Undecided conditions are managed separately.

UPSIDE

Revenue +15%

Simple yield 27.2%

Do not base the investment decision on the upside. Check the conditions for achieving it and whether it can be repeated.

Variable factor

Indicators to check

Main documents to check

Market revenue

Price, clearing, response, commitment

Operating policy, scheme requirements, past data

Equipment performance

Efficiency, degradation, downtime rate

Specifications, warranty terms, maintenance plan

Initial and operating costs

Connection, site preparation, maintenance, insurance

Quotations, site survey, contract terms

FAQ

Frequently asked questions
about revenue estimates

Where the answer changes with the scheme, the contract or the equipment conditions, we sort it out as a point to check for each project.

See the high-voltage BESS FAQ
QWhich markets make up the revenue of high-voltage grid-scale battery storage?
A

We mainly consider a combination of revenue opportunities such as the wholesale power market, the balancing market, and markets and schemes related to capacity. Whether you can actually take part, and how the revenue is split, depend on the equipment specifications, the area, the operating policy and the requirements of each scheme.

QAre the estimates shown a forecast of the actual yield?
A

No. The estimates on this page are assumed values based on set assumptions. They use the same formulas as our revenue and expense estimate model, but actual viability is estimated after checking the equipment cost, connection cost, operating conditions, market prices, financing, tax and more for each project.

QWhat information is needed first for a revenue estimate?
A

The candidate site, the grid connection conditions, the expected equipment scale, the business scheme, the financing policy, the holding period you want and so on. Even if some items are not yet decided, we can sort them out with the assumptions and the points to check kept separate.

QCan I also look at the case where market prices fall?
A

Yes. On this page, the sensitivity analysis shows the yield when revenue goes up or down. In an individual estimate, we also separate higher costs, a lower operating rate, faster degradation and other conditions, and check which of them affect viability.

QCan I decide on the simple payback period alone?
A

The simple payback period alone does not fully reflect the cash flow in each year, equipment renewal, financing, tax or residual value. It is important to judge by several indicators and assumptions together.

QCan warranty and maintenance costs be included in the estimate?
A

After checking the contract terms and what can be disclosed, we treat costs such as maintenance, monitoring, insurance and parts replacement as operating costs. The warranty terms differ by product and contract, so they need to be checked individually.

QIf I consult you, do I have to decide to invest?
A

No. You can use it first as a consultation to sort out the assumptions and the missing information, and to gather the material for deciding whether to continue the study.

REVENUE SIMULATION

Sort out the revenue assumptions
on the conditions of a real project.

Even if the candidate site or the equipment scale is not yet decided, we can start from what is known. We separate fixed values, assumptions and points still to check, and make clear the information needed for the next decision.

A consultation only is fine. This does not guarantee revenue or the recovery of your investment.