Creating success in grid-scale battery storage, together.

A graded candidate site for grid-scale battery storage with power transmission facilities in view

For investors and businesses considering buying a site

BESS Sites
You Should Not Buy

Looks and price alone cannot tell you whether a project will work. Before you buy, we sort out what may be overlooked on the grid, regulations and hazards, and give a free initial assessment based on the utility's response and public information.

  • Based on public information
  • Sorting out the issues in the response
  • Clarifying what to check next

Conclusion

The bottom line: do not buy land where you cannot confirm all 3 conditions at the same time on price or schedule alone.

Whether a battery storage site works as a project depends not only on the land itself but also on “whether it can connect to the power grid”, “whether permits and rights can be sorted out” and “whether measures against disasters and noise can work”. If you sign while even one of these is unconfirmed, it may lead to extra costs, changes to the plan or a longer timeline.

CHECK 01

Grid conditions

We check the response, the grid connection construction cost, the schedule, additional measures and the application conditions together as one set.

CHECK 02

Regulations & rights

We check landowner consent, boundaries and road frontage, procedures for development, farmland and the like, and buried cultural properties.

CHECK 03

Hazards & surroundings

We check disaster risks such as flooding and landslides, noise at the site boundary, and the surrounding environment.

Pre-purchase checklist

9 items to check
before signing

“There is a response”, “The site is already graded” or “A substation is nearby” is not enough to decide. We check that the documents are consistent with each other, and how the conditions affect the project’s finances and schedule.

GRID CONNECTION

Grid & connection

  • The reply to the connection study and the application status can be checked
  • The grid connection construction cost, the expected construction period and the payment status are known
  • Entries that could lead to additional equipment or changed conditions have been checked

LEGAL & RIGHTS

Regulations & rights

  • Landowner consent and the authority to use the land can be confirmed
  • Issues such as road frontage, boundaries, land category and development have been sorted out
  • Items to check in public information, such as buried cultural properties, are known

HAZARD & NEIGHBORHOOD

Hazards & surroundings

  • Risks such as flooding, landslides and ground conditions have been checked
  • The equipment can be laid out on the basis of the noise standard at the site boundary
  • The surrounding environment, such as homes, schools and hospitals, has been checked

If even one item is “no documents”, “unclear explanation” or “impact of the conditions unclear”, do not rush to sign; go to a specialist DD.
Not being able to confirm something is itself important risk information.

Common pitfalls

3 common oversights

In some cases the problem is not the land itself but the order of the checks or a lack of information to decide on. Before you buy, we separate out the following 3 points.

Hands comparing the utility's response with a map

PITFALL 01

Looking only at the “cost and schedule” in the response

The response may contain information that affects whether the project works, such as application conditions, technical constraints and items needing further checks. We check not only individual wording but also the application history and the status of the connection application.

Entries such as “No Special Measures Applied” and “Voltage Fluctuation Over 2%” are not judged on the spot; we work out their impact from the response as a whole.

A candidate battery storage site close to water and a slope

PITFALL 02

Thinking a graded site can be built on right away

Even flat land with road frontage needs checks on disaster risks, boundaries, land category, development and grading, buried cultural properties and more. We sort out the issues through a desk review of public information and lead on to the on-site and administrative checks that are needed.

We judge how easy the site looks to build on separately from whether construction is legally and technically possible.

A candidate site where the boundary fence and nearby homes are being checked

PITFALL 03

Thinking about noise after the equipment is decided

The criterion is not simply the distance to the nearest home, but the sound pressure at the site boundary, which depends on the municipality, the zoning district, the time of day and so on. We consider the equipment layout, orientation, clearances and noise control measures from the early planning stage.

The surroundings change. A layout with room to spare, which also allows for future use of neighboring land, is important.

Once you receive the response,
you can sort out the issues before buying.

Even if your documents are not complete, we check the current situation and sort out the documents and surveys needed next. Please consult us even if you have not decided between sale and entrustment.

A surveyor checking a candidate battery storage site with drawings and a tablet

What the diagnosis covers

What the free DD assessment
tells you

Rather than giving a definitive yes or no on the purchase, we make clear, from the documents available now, “what should be checked before going ahead”.

  • Issues in the response

    We sort out the connection conditions, the schedule and construction cost, and wording that needs further checks.

  • Location risks in public information

    We check hazards, noise, buried cultural properties and more on the basis of public information.

  • Documents and surveys needed next

    We sort out missing documents and the priorities for moving on to on-site, administrative and technical checks.

* The preliminary assessment is a rough assessment based on desk research, public information and the documents you provide. It does not make legal judgments or finalize surveying, ground investigation, design or permits.

Documents & flow

How the assessment works
and the documents to prepare

  1. Inquiry

    Tell us the location, the status of your study and what you want, such as sale, entrustment or considering a purchase.

  2. Sharing documents

    Share the documents you have at this point, such as the response, a location map and land-related documents.

  3. Preliminary desk check

    We sort out the issues in grid conditions, regulations and rights, and hazards and the surrounding environment.

  4. Results and next actions

    We guide you on the order of the next steps, such as additional documents, on-site checks, inquiries to the authorities, and consultation on sale or entrustment.

FAQ

Frequently asked questions before buying

Q Can you assess land that has no response from the utility?
A

An initial check is possible within the scope of public information and the documents you can provide. However, the reply to the connection study or similar documents are needed to confirm the grid conditions.

Q If a site falls within a hazard area, is it always ruled out?
A

Not necessarily across the board. We judge each case individually, including the type of disaster, the expected depth and zone, grading and equipment measures, insurance and project conditions.

Q Does the assessment include an on-site survey?
A

As a rule, the preliminary assessment is a rough assessment based on desk research, public information and the documents you provide. Site entry, surveying and definitive legal and technical investigations need to be checked separately.

Q How should I read entries such as “No Special Measures Applied” or “Voltage Fluctuation Over 2%”?
A

Because they can affect whether the project works and whether additional measures are needed, we check them together with the conditions of the response as a whole. Do not decide on the entry alone; consult a specialist, taking in the related documents and the application status.

Q Can I consult you even if I have not decided between sale and entrustment?
A

Yes, you can. We check the site conditions and your wishes and sort out the options of sale, entrustment or continuing to consider.

Q What documents should I prepare before the assessment?
A

Documents confirming landowner consent, the reply to the connection study, a copy of the connection application, and a location map, cadastral map, land survey map and the like help the check move forward.

A consultation table with documents on a grid-scale battery storage site

Before you sign

Buy, sell or entrust.
Sort out the site issues before you decide.

Based on the response and the land documents, we sort out what can be confirmed now, which documents are missing and what surveys are needed next.

Get the response assessed for free