Does it fit the installation conditions?
We check dimensions, weight, foundations, delivery, clearances and the surrounding environment.
LOW-VOLTAGE BESS PRODUCT
Low-Voltage BESS | Products We Handle
Centred on a 50kW hybrid PCS and a 102.4kWh battery, we check ease of installation, safety design and controllability against the conditions of your project.
The specifications shown are information for consideration based on materials provided by the manufacturer. When adopting the equipment, please check the latest specifications, warranty terms and certification status.
Hybrid PCS
rated output
Battery
nominal capacity
Lithium iron
phosphate
Protection rating in
the manufacturer materials
WHY PRODUCT SELECTION MATTERS
With low-voltage grid-scale battery storage (BESS), business viability needs to be considered including operating stability after installation, ease of maintenance and suitability for the installation site.
REVIX JAPAN checks whether GoodWe products are suitable, not only against catalogue values but also against the connection conditions, land conditions and operating plan of the project.
We check dimensions, weight, foundations, delivery, clearances and the surrounding environment.
We sort out the detection, stopping, extinguishing and protection functions and the division of responsibility.
We check control, monitoring, maintenance, replacement and warranty terms in advance.
GOODWE ESA SERIES
The ESA series is an industrial battery storage system that combines the 50kW hybrid PCS “GW50K-ET-JP-G10” and the 102.4kWh battery “GW102.4-BAT-AC-JP-G10”.
* Figures such as “about 1 m²” and “IP55” are information from materials provided by the manufacturer. Installation conditions and the scope of application are checked for each project.
FOUR POINTS
Rather than listing the specifications as they are, we put them into words that make decisions easier for business operators.
A configuration that combines a PCS with the battery cabinet makes it easier to plan for a limited installation area and for delivery.
The installation area and delivery route need an on-site checkLithium iron phosphate cells are used, and the manufacturer materials show control that keeps temperature differences between cells small.
Check the cell specifications and control conditions in the latest materialsDesigned in layers from detecting an abnormality to limiting damage, with smoke and heat detection, an emergency stop, fire extinguishing equipment and pressure measures.
The fire department consultation and construction requirements are checked for each projectThe PCS, the battery and higher-level control are linked to match the charge and discharge plan and the operating requirements of each project.
Supported protocols and the scope of EMS integration need to be designedSYSTEM ARCHITECTURE
In real projects, what matters is the consistency of the whole system, not a single device.
* The diagram is a conceptual diagram that explains the roles. The actual substation equipment, metering, communication, protection and EMS configuration differ by project.
CORE SPECIFICATIONS
We have narrowed down the information that needs checking before publication and set out only the items needed for a decision.
HYBRID PCS
BATTERY CABINET
The above is information for consideration, organized from materials provided by the manufacturer that were prepared in February 2026. It may change with product improvements, the configuration, the installation environment, and legal and grid requirements. On formal adoption, the latest data sheets, drawings, certification documents and warranty documents are checked.
Revenue for the GoodWe 49.9 kW / 100 kWh Package can be estimated in the Low-Voltage Simulator. See the Low-Voltage Simulator →
SAFETY BY LAYERS
What matters in a battery storage business is not just the names of the safety functions. We check what happens after an abnormality is detected, who responds, and how far the design limits damage.
Monitors conditions such as smoke, heat and temperature
Limits the spread of an abnormality with an emergency stop and protective control
Combines fire extinguishing equipment and pressure measures
Sets up a structure for alerts, on-site checks and recovery decisions
FIT FOR THE PROJECT
We sort out the items to check at a candidate site, such as the delivery route, foundations, clearances, noise, flooding and the surrounding environment.
See the land use process →We check the business plan including not only the equipment price but also the availability, maintenance costs, replacement risk and warranty terms.
See the investment consideration process →BEFORE DECISION
We do not decide on expectations of the product alone, and we make the conditions and the division of responsibility clear.
We check in writing the warranty period, the criteria for judging capacity loss, what is replaced, labour and transport costs, and the exclusions.
We check for each project the latest certification of the model concerned, the ordinances of the installation area, the fire department consultation, and the clearance, foundation and disaster-prevention requirements.
We estimate how the number of charge and discharge cycles, the SOC range, temperature, C-rate and downtime affect performance and revenue.
We sort out remote monitoring, the initial on-site response, the manufacturer response, spare parts, downtime during replacement and who bears the costs.
CONSULTATION FLOW
We check whether you have land, the area, the investment purpose and the preferred timing.
We sort out the required configuration from the grid conditions and installation conditions.
We check the quotation, warranty, maintenance, revenue assumptions and risks.
The items to check are resolved, and we move on to the formal design and contract.
FAQ
The answers on specifications and warranties change with the project conditions. First, we sort out the questions you have early in your consideration.
We consider a configuration centred on a 50kW-class PCS and a 100kWh-class battery, matched to the grid conditions, installation conditions and operating policy of the project. Whether it is actually adopted is decided after checking the site conditions, the response from the utility and the design.
The nominal capacity and the capacity actually available for operation are not necessarily the same. We check the effective capacity for each project, taking into account the SOC range during operation, measures against degradation, temperature conditions, control settings and so on.
The materials provided by the manufacturer show an IP55 protection rating and support for outdoor installation. However, there are conditions such as salt damage, snow, flooding, ambient temperature, clearances and foundations, so each installation location needs to be checked.
The materials provided by the manufacturer show a configuration that includes smoke and heat detection, an emergency stop, fire extinguishing equipment and an explosion-proof pressure relief valve. When the equipment is adopted, the latest specifications of the model concerned, the fire department consultation, the maintenance structure and the division of responsibility are checked individually.
The warranty period, capacity warranty, covered parts, exclusions and replacement conditions differ with the contract terms and operating conditions. This page does not state a definite number of warranty years. We provide the latest warranty terms before the formal quotation and the contract.
Yes. If you tell us the purpose of your consideration, the planned installation area, whether you have land and so on, we will sort out and provide the conditions to check in addition to the product overview.
GOODWE PRODUCT CONSULTATION
It is fine to only check the product materials. We sort out the items to check in line with your land, grid and business plan.
Free consultation | After we review your inquiry, a representative will contact you.