GRID CONNECTION DUE DILIGENCE

How to Read the Utility’s Response “Connection possible” alone
does not tell you whether the project works.

Before you buy, sell or entrust a grid-scale battery storage (BESS) site, we set out the points to check for reading the construction cost, construction period, conditions and applicant-side measures in the reply to the connection study together.

* The assessment is a preliminary review based on the documents we receive and public information. It does not guarantee whether connection is possible or any revenue.

A graded flat site with a transmission tower and substation equipment in the background
01Construction costThe construction cost and costs outside the response
02Construction periodStarting point, assumptions, range of change
03Required measuresAdditional work on the applicant side

CONCLUSION

Read the response
not for “yes or no” but
for the conditions that make it work.

The reply to the connection study is a document that shows, based on the conditions at the time of application, the connection method, the works needed, the approximate cost, the construction period, the measures required of the applicant and more.

Even if it says “connection possible”, the conditions may change with the detailed study after the contract application, the grid situation, the circumstances of the site or changes to the application. That is why the first thing to look at is not just the conclusion field, but the whole response, including the conditions field, the notes and the applicant-side measures.

6 CHECKPOINTS

6 items to check in the response

Rather than only reading from top to bottom, cross-check the cost, construction period and conditions against each other.

  1. 01

    Response date and validity period

    Check whether the response can still be used for procedures and whether the assumptions have changed.

  2. 02

    Whether connection is possible and the connection method

    Check the conditions attached to “possible”, the connection point, the grid classification and the conditions for applying non-firm connection and the like.

  3. 03

    Grid connection construction cost

    In addition to the total, the breakdown and the scope covered, check whether the developer’s own equipment or land works are included.

  4. 04

    Expected construction period

    Read the assumptions behind the period, such as the starting point, coordination of grid outages for the works, land negotiations and payment conditions.

  5. 05

    Measures required of the applicant

    Check additional requirements such as protection devices, voltage measures, communications, metering and operational control.

  6. 06

    Notes and change conditions

    Check through to the conditions for a re-study, the factors that can change the cost and construction period, confidentiality obligations and the next procedures.

The hands of a staff member checking the response against a map at a desk

Sources checked: Organization for Cross-regional Coordination of Transmission Operators (OCCTO), "Grid Access Process for Power Generation Facilities" (in Japanese), and the response formats of the general transmission and distribution operators. Give priority to your individual response.

HOW TO READ

Read 1 response
in 3 layers

Separating out not only the amounts and dates on the surface but also the conditions and future changes reduces oversights.

The surroundings of a candidate site for grid connection, with distribution equipment and transmission towers side by side

COMMON MISREADINGS

3 pitfalls where
misreadings often happen

  1. 01

    Comparing on the grid connection construction cost alone

    Compare on the total project cost, including equipment outside the response, grading, design, testing and operating constraints.

  2. 02

    Taking “connection possible” as a commitment

    The conditions are fixed only after the subsequent procedures, such as the contract application, the detailed study and the grid connection construction cost agreement.

  3. 03

    Not estimating the applicant-side measures

    Conditions on voltage, protection, communications, metering, control and so on affect not only equipment costs but also the site and the construction period.

KEY TERMS

Entries to check individually when you find them

Systems, the grid and response formats are updated and differ by region, so check what each entry means and who bears the cost.

* The above are examples of terms to watch out for. Do not decide yes or no from the entry alone; give priority to the main text of the response, the attached conditions and checks with the general T&D operator.

BEFORE PURCHASE / BEFORE SALE

Turn the response into an “issue list”
you can use to decide on a sale or purchase.

Based on the response, maps and site documents, we sort out gaps in the checks, additional documents and site-side risks.

REVIX PRE-CHECK

What the preliminary assessment sorts out

  • 01

    Key conditions in the response

    We list the construction cost, construction period, connection method, applicant-side measures and change conditions.

  • 02

    Issues that need further checks

    We sort out unclear entries, costs outside the response and points to check with the general T&D operator.

  • 03

    Initial site-side risks

    We check hazards, road frontage, boundaries, noise, laws and regulations, cultural properties and more on the basis of public information.

  • 04

    Next procedures and documents needed

    We make clear the additional documents to collect and the order for moving on to consultation, application and on-site checks.

* At a stage that does not involve an on-site survey or inquiries to the general T&D operator, this is a rough review based on desk research and public information.

A consultation table with site documents and the response spread out to check the project conditions

DOCUMENTS & FLOW

Documents and process for a consultation

Documents we would like you to share first

  • The full reply to the connection study
  • Connection study application form / copy
  • Location, lot number, cadastral map, etc.
  • Land rights and documents confirming landowner consent
  • Existing survey and quotation documents

You can consult us even if you do not have them all. We will make clear which documents are still missing.

  1. STEP 01

    Sharing documents

    Share the response and site documents you have at this point.

  2. STEP 02

    Desk check

    We cross-check the conditions in the response against public information.

  3. STEP 03

    Sorting out the issues

    We sort out the items for further checks and the points to note for the business decision.

  4. STEP 04

    Next direction

    We guide you on how to proceed, such as sale, entrustment or continuing to consider.

FAQ

Frequently asked questions
on reading the response

Conditions differ between individual responses. Where you are unsure, check each document.

QIf I have the response, can I assume the site can be connected?

No. The reply to the connection study is the result of a study based on the conditions at the time of application, and is not a document that commits to grid connection itself. The works, cost, construction period and required measures may change through the detailed study after the contract application or changes in the grid situation.

QWhat should I check first?

Check in this order: the response date and validity period, whether connection is possible and the conditions, the grid connection construction cost, the expected construction period, the measures required of the applicant, and the notes and assumptions. It is important to read not only the amounts but also, at the same time, the conditions that require additional work on the developer’s side.

QIf the grid connection construction cost is low, is it a good project?

Not necessarily. You need to recheck the total project cost and the revenue assumptions, including equipment measures needed outside the response, operating constraints, land-side works and the risk of changes to the application.

QHow should I read entries on “No Special Measures Applied” or voltage fluctuation?

Because they can affect the assumptions for the project’s finances and additional equipment, do not decide only on whether the entry is there; check the conditions of application, the equipment needed, the cost sharing and the operating conditions with the general transmission and distribution operator or a specialist. Systems and individual responses are updated and differ from one another, so check the latest information.

QCan I consult you about land that has no response?

Yes. We can sort out the initial issues from the documents available at this point, such as the location, lot number, land documents, and road frontage and boundary information. However, procedures such as a connection study and a contract application are needed to decide the final connection conditions.

QWhat does the assessment tell me?

We sort out the key conditions in the response, items that need further checks, site-side issues such as hazards, road frontage and noise, and the documents to collect next. The results are a preliminary review based on public information and the documents we receive, and do not guarantee whether connection is possible or the project’s revenue.

QCan I share the response freely with third parties?

The response may carry notes that restrict confidential information or use for other purposes. Before sharing it for a sale or purchase, brokerage or DD, check the notes in the document, the applicant’s consent and whether confidentiality is required.

LAND DUE DILIGENCE

Why not check that response
before deciding on a sale or purchase?

We separate the grid conditions from the site conditions and sort out the issues to check next.

Ask about a free DD assessment

You can consult us even before you have the response or while some documents are missing.