Creating success in grid-scale battery storage, together.

For corporate customers Now accepting installation consultations with tax incentives in view Immediate depreciation of 100 million yen or more every year for 5 years is possible* | Reference model: 8 units a year × 5 years, 40 units ↓

* Estimate based on a reference model under the Tax Incentive for Promoting Investment in Specified Productivity-Improving Equipment (in force from July 31, 2026). Confirmation by the Minister of Economy, Trade and Industry and meeting the tax requirements are necessary, and application is not guaranteed.

NEW | New productRENON 49.9kW / 133kWh Pre-order sales have startedSales price 15 million yen, 5-year warrantySee the RENON page →

GOODWE | LOW-VOLTAGE BESS

Low-Voltage BESS | GoodWe “49.9kW / 100kWh” Package

The GoodWe “49.9kW / 100kWh” Package:
low-voltage grid-scale battery storage you can start from 12.5 million yen.

A standard package for low voltage using the GoodWe ESA series. A new kind of power infrastructure investment that starts from a small site.

Equipment makerGOODWE

Prices and expected yields (not guaranteed) are reference values based on our estimates (pre-tax, as of July 2026). They vary with the market environment and operating conditions and do not guarantee future revenue.

From 12.5 million yen

Equipment cost
(49.9kW / 100kWh)

16% or more

Expected yield (not guaranteed)
(pre-tax, our estimate*)

5+ / 15 years

Equipment warranty
(manufacturer’s product warranty)

About 10 months

Guide to the time
until installation

About 6 tsubo

Installation guide
(unit about 1.1 m²)

PRODUCT | GOODWE ESA SERIES

“49.9kW / 100kWh” from 12.5 million yen.
A standard package designed to be easy to start.

It uses the GoodWe ESA series (an integrated industrial battery storage system that supports PV, batteries and on/off-grid operation). It consists of the following 3 devices, and no dedicated mount for the power conditioner is needed.

GW50K-ET-JP-G1050kW hybrid power conditioner (set to 49.9kW) GW102.4-BAT-AC-JP-G10100kWh battery (outdoor-specification cabinet) SEC3000CCommunication and metering unit (assumes EMS and aggregator integration)
Front of a GoodWe ESA series battery cabinet
POINT 01

Low initial cost

The equipment cost is from 12.5 million yen. A standard package for low voltage.

POINT 02

Fast payback

The expected yield (not guaranteed) of the 5-years-and-up plan is 23.38%*. A revenue design that puts weight on fast payback, centred on the standby payment (ΔkW) in the balancing market.

* Pre-tax, our estimate. It varies with the market environment and operating conditions and is not guaranteed.

POINT 03

Small, so easy to operate
even in a small space

A compact design in an integrated cabinet (installation area about 1.1 m², guide about 6 tsubo). Designed to be easy to install and operate even on small sites such as idle land or the area around buildings.

Usable capacity100kWh (up to 4 units connected; expandable from 100kWh to 4MWh)
Cell typeLFP (lithium iron phosphate)
Maximum charge / discharge power92kW / 112kW
Cycles / charge and discharge efficiency6,000 cycles / 96%
Dust and water protection / corrosion resistanceIP55 (outdoor installation possible) / C5 (conditions apply in areas with heavy salt damage)
Safety equipmentAerosol fire extinguishing equipment, explosion-proof pressure relief valve, smoke / heat detectors, emergency stop
Dimensions / weight1055 × 2000 × 1055 mm / 1,400kg
GOODWE

GoodWe Technologies Co., Ltd. | A specialist manufacturer of inverters and battery storage systems with installations in more than 100 countries worldwide. REVIX has adopted its products as one of the types of equipment it handles for low-voltage grid-scale battery storage (BESS).

GoodWe official website ↗

* The specifications are information for consideration based on materials provided by the manufacturer. When adopting, please check the latest specifications, warranty terms and certification status. * Expansion to the 160kWh class or above may count as a “small quantity of hazardous materials” under the Fire Service Act, so an individual check is required.

REVENUE SIMULATION

Revenue simulation (pre-tax, our estimate)

In our estimate, battery-only operation outperforms operation co-located with solar. The expected yield (not guaranteed) by equipment capacity and period is as follows.

ConfigurationPeriodPrice (equipment cost)Battery-only operationCo-located with solar
Low-voltage 49.9kW / 100kWh5 years and up12.5 million yen23.38%14.57%
Low-voltage 49.9kW / 100kWh15 years17.5 million yen16.56%10.90%
Low-voltage 49.9kW / 200kWh15 years25 million yen11.45%7.85%Solar co-location
recommended

* The figures are the expected yield (pre-tax, not guaranteed) for a landholder. * The balancing market is estimated at 6.4 yen. * This simulation gives reference values based on assumptions we have set. Actual revenue varies with the size of the plant, the utility service area, market prices, bidding and award results, operating conditions and so on, and does not guarantee future revenue. We prepare detailed estimates individually.

• This product is a sale of movable property (battery storage equipment) and is not a financial product.

• The expected yield (not guaranteed) is a pre-tax reference value based on assumptions we have set (balancing market prices, availability and so on). It varies with the market environment and is not guaranteed.

• The equipment warranty (5 years and up / 15 years) is a warranty by the manufacturer, and its coverage and scope depend on the warranty terms (natural disasters and the like may be outside the scope).

• There is a risk that revenue changes due to changes in the power market rules and in market prices.

WHY 100kWh

Why a 100kWh configuration?

In this operating model, increasing the battery capacity hardly increases annual revenue. The configuration keeps to the capacity needed for operation and holds down the equipment cost by that amount.

REASON 01

Revenue is set by “output,”
not by “capacity”

The standby payment (ΔkW) in the balancing market, the core of the revenue, is paid for the output that can respond. If the power conditioner output is the same 49.9kW, increasing the battery capacity to 200kWh does not increase the standby payment.

REASON 02

100kWh is enough
capacity for operation

The standard operation in primary balancing capacity (offline) is “3 hours of charging → 3 hours of selling power → offline standby.” What standby actually needs is about 1 hour, or about 50kWh, so 100kWh meets the operating requirement.

* 100kWh is also a capacity design that stays below the line for a “small quantity of hazardous materials” under the Fire Service Act (the 160kWh class or above). Whether it applies is checked individually, depending on the installation conditions and the judgement of the local fire department.

REASON 03

A lower equipment cost makes
investment efficiency easier to raise

If annual revenue hardly changes with capacity, the smaller the equipment cost, the easier it is to raise the ratio of revenue to the investment amount (the expected yield, not guaranteed). The equipment cost of this package is from 12.5 million yen.

Main source of revenue: 24-hour operation in primary balancing capacity (offline)

Primary balancing capacity (offline) standby (45/48 slots, standby payment ΔkW) SOC maintenance charging (3/48 slots, 1.5 hours between 3:00 and 6:00)
0:003:006:0012:0018:0024:00

* This explanation is based on our estimate (balancing market 6.4 yen). Actual revenue and yield vary with market prices, award results, operating conditions and so on, and are not guaranteed. For details of the assumptions, see the notes to the revenue simulation above.

TAX INCENTIVE | For corporate customers

“8 units a year × 5 years” toward immediate depreciation of 100 million yen or more every year.

On July 31, 2026, the “Tax Incentive for Promoting Investment in Specified Productivity-Improving Equipment” came into force. In a reference model that installs 40 units of this product, at 12.5 million yen each, over 5 years, the total acquisition cost of the eligible equipment reaches 500 million yen, the investment scale requirement for small and medium-sized enterprises, etc.

If the requirements are met, you can choose “immediate depreciation” or a “7% tax credit” for the fiscal year in which the equipment is put to business use. REVIX supports organizing the materials for checking with a specialist such as a tax accountant, such as the quotation breakdown, the installation schedule, the basic materials for the revenue plan, and the site and grid conditions.

* This is not a system that is granted automatically when 40 units are installed. Confirmation of the investment plan by the Minister of Economy, Trade and Industry (main criteria: eligible equipment of 500 million yen or more *for SMEs, etc.; an average annual return on investment of 15% or more; acquisition and placing in service within 5 years after confirmation) and meeting the tax requirements are necessary. The amounts are reference values and do not guarantee the scope recognized as acquisition cost. Please check with a specialist such as a tax accountant whether it applies (system information as of July 31, 2026).

FAQ

FAQ on the
GoodWe Package

The answers on price, yield and installation conditions change with the project conditions. We sort out the questions you have early in your consideration.

Q1What does “from 12.5 million yen” include?
A

It is the equipment cost of the standard package, which consists of a 50kW hybrid power conditioner set to 49.9kW, a 100kWh battery and an SEC3000C communication unit. Foundation work, grid connection costs and so on differ by project, so we advise on them individually.

Q2Is the expected yield (not guaranteed) of 16% or more guaranteed?
A

No. It is a reference value from our pre-tax estimate (with the balancing market estimated at 6.4 yen), and it varies with market prices, bidding, award results, operating conditions and so on. It is not a guaranteed yield.

Q3How much land is needed for installation?
A

The unit footprint is about 1.1 square metres, and the guide for installation is about 6 tsubo. The area required, including foundations, wiring, maintenance space, clearances and so on, needs to be checked individually according to the site conditions.

Q4Where does the revenue come from?
A

It centres on the standby payment (ΔkW) in the balancing market (primary balancing capacity, offline). The main operation is SOC maintenance charging in the low-price hours late at night, with most of the 24 hours spent on standby.

Q5Does immediate depreciation always apply?
A

No. For the Tax Incentive for Promoting Investment in Specified Productivity-Improving Equipment to apply, confirmation of the investment plan by the Minister of Economy, Trade and Industry and meeting the tax requirements are necessary. The scope recognized as the acquisition cost of eligible equipment and whether you qualify as a small or medium-sized enterprise, etc. also need individual checks, so please consult a specialist such as a tax accountant.

Q6Can the capacity be increased later?
A

Yes. Up to 4 batteries can be connected to one power conditioner (ET50), and the capacity can be expanded in 100kWh units. At the 160kWh class or above, the system may count as a small quantity of hazardous materials, so the installation conditions need an individual check when expanding.

NEW PACKAGE CONSULTATION

Can you start at this price?
We check it with you, starting from your land conditions.

It is fine to only request a revenue estimate. We sort out the items to check in line with your land, grid and business plan.

Free consultation | After we review your inquiry, a representative will contact you. Expected yields (not guaranteed) and prices are reference values based on our estimates.