Site conditions
- Room for the equipment, clearances and maintenance access can be secured
- Construction and maintenance vehicles can get in
- Foundations, drainage and disaster risk can be checked
For investors and business partners
Before an investment decision, we set out the points to check for the site, the grid, the equipment and the rights. Even before your documents are ready, you can consult us about what to check next.
CONDITIONS
Even if there is space for the equipment, the economics and the schedule cannot be fixed while any of the grid conditions, the constructability or the rights remain unconfirmed. It is important to check the 4 areas in parallel.
Assumptions for the decision
The above are general areas to check. The formal requirements, the documents to submit, notifications and construction conditions differ with the regional general transmission and distribution operator, the municipality, the equipment specifications and the contract scheme.
SITE CHECK
At the early stage, sorting out “where, at what scale, roughly when and who wants to go ahead” comes before perfect application documents. If on-site photos, a map, the lot number and the status of the rights are known, it becomes easier to separate out the surveys needed next.
COMMON PITFALLS
The earlier the issues are found, the easier it is to avoid unnecessary redoing of design and contracts.
01
It only becomes material for a decision once the available capacity, the impact when charging, protection coordination and the scope of work have been checked.
02
The on-site conditions need to be checked, including road frontage, delivery, foundations, drainage, the neighbors and maintenance access routes.
03
We reflect the grid connection work, operating constraints, maintenance, contract terms and schedule in the economics.
It is fine before your documents are ready
CONSULTATION
Rather than giving an instant “yes or no,” we sort out the information needed for an investment decision stage by stage.
We make the current situation visible across the 4 areas of site, grid, equipment and rights.
We set priorities for each stage: the initial consultation, the contract application to the utility, and the contract and construction.
We make clear the next action that suits the project, such as a preliminary consultation, sorting out the specifications or checking the rights.
DOCUMENTS
You do not need to gather everything from the start. A checklist by stage (initial consultation → contract application to the utility → contract, design and construction) is on a dedicated page.
Stage-by-stage checklist of required documentsSee what to submit, when and why, listed stage by stage
See the required documents page →PROCESS
We raise the accuracy of the checks step by step, according to the documents you have.
Share the location, scale, preferred timing and status of the rights
Sort out what is confirmed and unconfirmed across the 4 areas
Prepare drawings, specifications and rights documents in order of priority
Make the grid, design, legal and electrical safety conditions concrete
Decide based on the cost, construction period, constraints and operating structure
ALTERNATIVES
Before ruling a project out, we separate the conditions that can change from those that cannot.
We review the location conditions that affect viability, such as road frontage, disaster risk and grid conditions.
Changing the output, capacity, layout or operating conditions may change whether the project can work.
We adjust the order of the grid connection work, rights acquisition and permits to limit rework.
Missing roles, such as equipment, land, operation or funding, are filled through partnerships.
FAQ
We answer questions you may have before your study, focusing on items where the decision changes case by case.
It cannot be judged by a single nationwide area alone. In addition to the equipment itself, we check case by case, including maintenance access routes, clearances, foundations, fences, the incoming line route and access for construction vehicles.
Being close by does not settle whether connection is possible. The available capacity, voltage, protection coordination, the content of the work, the impact on the grid when charging and so on are checked in the study by the general transmission and distribution operator.
An initial consultation is possible. Please share your current situation, such as owning, leasing or planning to acquire the land, and we will sort out the missing documents and the order in which to obtain them. For the formal application, the prescribed documents confirming the rights may be required.
There is room to consider it if the contract term, the renewal terms, equipment removal, the requirements for asserting the right against third parties, the right of entry for construction and maintenance and so on can be confirmed. The details of the individual contract are checked together with specialists.
The document names, the submission format and any additional documents differ with the general transmission and distribution operator, the equipment specifications, the contract scheme and municipal procedures. This page sets them out as general items to prepare.
No, it is not certain. The investment decision needs to take together the content of the response, the grid connection construction cost, the construction period, operating constraints, the land and permits, and the procurement terms.
From the documents you have now, we sort out the items already confirmed, the missing information, the items to look into first and the candidate next procedures. It does not guarantee revenue or whether connection is possible.
PROJECT CHECK
If you share your project conditions, we sort out the 4 areas to check, the missing documents and the next procedures.
A consultation or a request for materials does not guarantee profitability, whether connection is possible, or that the project will go ahead.