The revenue assumptions move
Market prices, clearing results and product requirements are not fixed. The project has to be tested across several scenarios, not on a single price or past results alone.
Registration No.: 2025100600000911JC-STAR ★1 conformity label obtainedGrid connection capacity securedLand included
We offer high-voltage grid-scale battery storage stations with the grid connection capacity and the land already in place, from 600 million yen (excluding tax). This page also sets out the view an investment decision needs: the revenue assumptions, the land, safety and long-term operation.
* You can reach the consultation and document request forms from the middle and the end of this page.
INVESTMENT DECISION
Market revenue is possible, but the result of the investment depends on several conditions: grid connection, equipment configuration, permits, availability, operating costs and regulatory change.
Market prices, clearing results and product requirements are not fixed. The project has to be tested across several scenarios, not on a single price or past results alone.
Connection cost, construction period, ground, delivery access, fire safety, noise and development permits differ by candidate site, and they decide the investment amount and when the business can start.
Beyond the warranty years, what matters is the long-term operating structure: monitoring, parts supply, fault isolation and responsibility for recovery.
REVIX FRAMEWORK
We treat the project as one investment, from the business scheme through to operation, rather than as a piece of equipment on its own.
We build the revenue sources, such as the balancing, capacity and wholesale power markets, around what the project can take part in and its operating constraints.
We check at an early stage the conditions that decide whether the project can go ahead: the connection study, delivery access, ground, fire safety, noise and zoning.
We look at the battery, PCS, EMS, enclosure and communications as one system, and check the certificates, their scope and the operating requirements against each other.
We make the risk of downtime visible, from monitoring, inspection and fault response to the warranty, spare parts and coordination with the aggregator.
REVENUE STRUCTURE
A high-voltage BESS operates across markets with different time frames and different kinds of value. Which markets a project can actually take part in, and how its revenue is made up, depend on the equipment specifications and the regulatory requirements.
BALANCING
Providing balancing capacity
A market where you provide the "ability to adjust" that keeps the grid stable, and are paid for it.
See how it worksCAPACITY
Securing supply capacity
A mechanism for securing future "ability to supply" and being paid for it.
See how it worksWHOLESALE
Optimizing charge and discharge
A market where the price gaps between times of day are turned into revenue by charging and discharging.
See how it worksOPERATION
Operating the high-voltage BESS
Charge and discharge planning across markets, and availability management
We state the assumptions, such as market prices, clearing rate, availability, degradation, operating costs and regulatory requirements, and estimate on that basis. An estimate does not guarantee future revenue.
How the revenue is put together is explained in "How a battery earns"How the 3 markets are used, the 24-hour operating decisions and how to read viability, on one page
See how the revenue works →Looking for a property?
High-voltage battery storage stations with land and grid connection secured, now on sale
Want to see the numbers first?
Enter the capacity and the conditions, and you get a rough annual revenue figure
DUE DILIGENCE
Area, shape, ground, delivery access, surroundings, contract terms
Status of the connection study, point of connection, grid connection construction cost, schedule
Fire safety, development permit, noise, building, scope of the certificates
Capacity, output, efficiency, degradation, availability, control and communications
EPC, O&M, warranty, insurance, financing, responsibility boundaries
EVIDENCE & OPERATIONS
We check not just the name and the number of years, but the equipment covered, the conditions that apply, the certificates and the scope of responsibility in the contract.
We check the fire resistance of the enclosure, the battery safety standards, consultation with the fire authority and the noise design for the combination of the candidate site and the chosen equipment.
We check the connectivity of the BMS, PCS, EMS and communications, together with access control, change management, monitoring and recovery procedures, on both the equipment side and the operating side.
Beyond the capacity warranty, we set out in the contract terms the remote monitoring, inspection intervals, parts supply, on-site response, and the contact point and responsibility through to recovery.
For the properties REVIX sells (those listed on the properties page), the batteries of every property have obtained JC-STAR ★1.
* For projects other than the properties on sale, the specific use and scope of the KHK evaluation, the JC-STAR conformity label, and the warranty and monitoring structure are checked for each proposed equipment, contract and project condition.
PROJECT SCREENING
The candidate site, connection status and investment terms do not have to be settled yet. We confirm where you stand and make clear what information to gather next.
You can also choose from properties with the grid connection capacity already secured. See the properties on sale (connection secured, from 600 million yen excluding tax) →
PROJECT FLOW
We move through the necessary checks in stages, matched to how far the project has progressed.
Confirm the candidate site, connection status, investment policy and preferred timing.
Sort out the main risks: land, grid, regulations, delivery access and more.
Set a provisional equipment configuration, schedule, cost items and operating plan.
Test revenue, costs and sensitivity across several scenarios.
Fix the responsibility boundaries, warranty, procurement, and construction and operating terms.
Construction, commissioning and preparation for market participation, then handover to monitoring and maintenance.
* The period and the schedule vary with the project conditions, such as the grid connection study, permits and equipment procurement.
FIRST CONSULTATION
If you have the land registry, cadastral map, connection study documents or an existing estimate, please share them. You can consult us before they are ready.
FAQ
Mainly a combination of the balancing market, the capacity market and the wholesale power market (JEPX). Because the participation conditions, prices, clearing results and operating constraints change, a revenue estimate with assumptions set for each project is needed.
No. The result changes with the equipment specifications, connection cost, site conditions, operating costs, financing terms, market prices, availability and more. In an individual consultation we set out how the estimate is made, with its assumptions stated.
We check not only the area needed but also the possibility of grid connection, delivery access, ground, zoning, fire safety, noise and the surrounding conditions as a whole. The final decision is subject to consultation with the power company, the competent authorities and the fire service.
For the enclosure, battery, PCS, EMS and other equipment adopted, check the scope covered, the evaluation body, the registration number, the valid certificates and the conditions that apply. For the KHK evaluation, the JC-STAR conformity label and similar, what matters is not the name alone but how it corresponds to the equipment in question.
Check, contract by contract, the capacity warranty, equipment warranty, remote monitoring, periodic inspection, emergency response, replacement parts and responsibility boundaries. Not just the warranty years but also the exclusions and the recovery process are important items for the investment decision.
It depends on the grid connection study, land and permits, design, equipment procurement, construction, commissioning and preparation for market participation. Rather than stating one standard period for every case, we confirm the project conditions and draw up a schedule.
The initial sorting goes faster with information on the candidate site, the land registry and cadastral map, the status of the connection study, the preferred business scheme, the investment terms and any existing business plan. You can consult us even before the documents are complete.
START WITH THE CONDITIONS
Whether or not you already have a candidate project, you can consult us from the stage of considering the investment policy, the land and the business scheme.
* Estimates and plans are based on assumptions and do not guarantee future revenue or the start of the business.