Creating success in grid-scale battery storage, together.

Rows of high-voltage grid-scale battery storage containers beside transmission equipment

JC-STARRegistration No.: 2025100600000911JC-STAR ★1 conformity label obtainedGrid connection capacity securedLand included

High-voltage battery storage stations
with grid connection secured
and land included, now on sale.

We offer high-voltage grid-scale battery storage stations with the grid connection capacity and the land already in place, from 600 million yen (excluding tax). This page also sets out the view an investment decision needs: the revenue assumptions, the land, safety and long-term operation.

* You can reach the consultation and document request forms from the middle and the end of this page.

INVESTMENT DECISION

A high-voltage BESS investment cannot
be judged on "profitability" alone.

Market revenue is possible, but the result of the investment depends on several conditions: grid connection, equipment configuration, permits, availability, operating costs and regulatory change.

POINT 01

The revenue assumptions move

Market prices, clearing results and product requirements are not fixed. The project has to be tested across several scenarios, not on a single price or past results alone.

POINT 02

The initial conditions change viability

Connection cost, construction period, ground, delivery access, fire safety, noise and development permits differ by candidate site, and they decide the investment amount and when the business can start.

POINT 03

Downtime becomes lost opportunity

Beyond the warranty years, what matters is the long-term operating structure: monitoring, parts supply, fault isolation and responsibility for recovery.

REVIX FRAMEWORK

We connect the points an investment decision needs
across 4 design areas.

We treat the project as one investment, from the business scheme through to operation, rather than as a piece of equipment on its own.

Market and revenue design

We build the revenue sources, such as the balancing, capacity and wholesale power markets, around what the project can take part in and its operating constraints.

Land, grid and permits

We check at an early stage the conditions that decide whether the project can go ahead: the connection study, delivery access, ground, fire safety, noise and zoning.

Equipment, safety and control

We look at the battery, PCS, EMS, enclosure and communications as one system, and check the certificates, their scope and the operating requirements against each other.

Maintenance and responsibility boundaries

We make the risk of downtime visible, from monitoring, inspection and fault response to the warranty, spare parts and coordination with the aggregator.

REVENUE STRUCTURE

Revenue is a combination of several markets
and operating conditions.

A high-voltage BESS operates across markets with different time frames and different kinds of value. Which markets a project can actually take part in, and how its revenue is made up, depend on the equipment specifications and the regulatory requirements.

Assumptions we always state in a revenue estimate

We state the assumptions, such as market prices, clearing rate, availability, degradation, operating costs and regulatory requirements, and estimate on that basis. An estimate does not guarantee future revenue.

How the revenue is put together is explained in "How a battery earns"How the 3 markets are used, the 24-hour operating decisions and how to read viability, on one page

See how the revenue works →

DUE DILIGENCE

Before the investment decision,
check 5 preconditions.

  • 01
    Site conditions

    Area, shape, ground, delivery access, surroundings, contract terms

  • 02
    Grid connection

    Status of the connection study, point of connection, grid connection construction cost, schedule

  • 03
    Permits and safety

    Fire safety, development permit, noise, building, scope of the certificates

  • 04
    Equipment and operation

    Capacity, output, efficiency, degradation, availability, control and communications

  • 05
    Contracts and finance

    EPC, O&M, warranty, insurance, financing, responsibility boundaries

High-voltage grid-scale battery storage installed on a candidate site, with transmission equipment

EVIDENCE & OPERATIONS

3 qualities to check
in a long-term business asset.

We check not just the name and the number of years, but the equipment covered, the conditions that apply, the certificates and the scope of responsibility in the contract.

QUALITY 01

Safety and permits

We check the fire resistance of the enclosure, the battery safety standards, consultation with the fire authority and the noise design for the combination of the candidate site and the chosen equipment.

  • Scope of the evaluation and certification
  • Prior consultation with the authorities
  • Layout, separation distances and noise control plan
QUALITY 02

Control and security

We check the connectivity of the BMS, PCS, EMS and communications, together with access control, change management, monitoring and recovery procedures, on both the equipment side and the operating side.

  • Responsibility boundaries between devices
  • Conformity label and registration details
  • Incident response procedures
QUALITY 03

Maintenance, warranty and recovery

Beyond the capacity warranty, we set out in the contract terms the remote monitoring, inspection intervals, parts supply, on-site response, and the contact point and responsibility through to recovery.

  • Warranty terms and exclusions
  • Preventive maintenance and parts planning
  • Escalation in the event of a fault

For the properties REVIX sells (those listed on the properties page), the batteries of every property have obtained JC-STAR ★1.

* For projects other than the properties on sale, the specific use and scope of the KHK evaluation, the JC-STAR conformity label, and the warranty and monitoring structure are checked for each proposed equipment, contract and project condition.

PROJECT SCREENING

We sort out whether a candidate project is a "go" or a "pass",
starting from the initial conditions.

The candidate site, connection status and investment terms do not have to be settled yet. We confirm where you stand and make clear what information to gather next.

You can also choose from properties with the grid connection capacity already secured. See the properties on sale (connection secured, from 600 million yen excluding tax) →

PROJECT FLOW

From consultation to the go/no-go decision

We move through the necessary checks in stages, matched to how far the project has progressed.

  1. STEP 01

    Initial hearing

    Confirm the candidate site, connection status, investment policy and preferred timing.

  2. STEP 02

    First screening

    Sort out the main risks: land, grid, regulations, delivery access and more.

  3. STEP 03

    Basic plan and rough estimate

    Set a provisional equipment configuration, schedule, cost items and operating plan.

  4. STEP 04

    Viability assessment

    Test revenue, costs and sensitivity across several scenarios.

  5. STEP 05

    Contracts and detailed design

    Fix the responsibility boundaries, warranty, procurement, and construction and operating terms.

  6. STEP 06

    Installation and operation

    Construction, commissioning and preparation for market participation, then handover to monitoring and maintenance.

* The period and the schedule vary with the project conditions, such as the grid connection study, permits and equipment procurement.

FIRST CONSULTATION

What the first consultation covers

  • First-pass suitability of the candidate site, and the additional survey items
  • The points at issue in the planned equipment and business scheme
  • The assumptions a revenue estimate needs, and the documents still missing
  • The next steps, the parties involved and a rough schedule

If you have the land registry, cadastral map, connection study documents or an existing estimate, please share them. You can consult us before they are ready.

A representative checking documents at a first consultation on a high-voltage battery investment

FAQ

Frequently asked questions about high-voltage battery investment

Which markets does the revenue of a high-voltage grid-scale battery come from?

Mainly a combination of the balancing market, the capacity market and the wholesale power market (JEPX). Because the participation conditions, prices, clearing results and operating constraints change, a revenue estimate with assumptions set for each project is needed.

Can I judge the expected yield (not guaranteed) or the payback period from this page alone?

No. The result changes with the equipment specifications, connection cost, site conditions, operating costs, financing terms, market prices, availability and more. In an individual consultation we set out how the estimate is made, with its assumptions stated.

What kind of site is needed?

We check not only the area needed but also the possibility of grid connection, delivery access, ground, zoning, fire safety, noise and the surrounding conditions as a whole. The final decision is subject to consultation with the power company, the competent authorities and the fire service.

What should I check about safety and certification?

For the enclosure, battery, PCS, EMS and other equipment adopted, check the scope covered, the evaluation body, the registration number, the valid certificates and the conditions that apply. For the KHK evaluation, the JC-STAR conformity label and similar, what matters is not the name alone but how it corresponds to the equipment in question.

How far do the warranty and maintenance extend?

Check, contract by contract, the capacity warranty, equipment warranty, remote monitoring, periodic inspection, emergency response, replacement parts and responsibility boundaries. Not just the warranty years but also the exclusions and the recovery process are important items for the investment decision.

How long does it take until the business starts?

It depends on the grid connection study, land and permits, design, equipment procurement, construction, commissioning and preparation for market participation. Rather than stating one standard period for every case, we confirm the project conditions and draw up a schedule.

Are there documents I should prepare before the consultation?

The initial sorting goes faster with information on the candidate site, the land registry and cadastral map, the status of the connection study, the preferred business scheme, the investment terms and any existing business plan. You can consult us even before the documents are complete.

A high-voltage grid-scale battery storage site at dusk

START WITH THE CONDITIONS

Start your high-voltage BESS investment
by sorting out the conditions.

Whether or not you already have a candidate project, you can consult us from the stage of considering the investment policy, the land and the business scheme.

* Estimates and plans are based on assumptions and do not guarantee future revenue or the start of the business.