LAND ENTRUSTMENT CONDITIONS

For those who want to entrust a grid-scale battery storage (BESS) site Entrustment terms

Sort out first the conditions needed for a decision, such as the response, landowner agreement, hazards and the construction period. Even for a project that looks ineligible, the free DD assessment shows whether there is room to consult.

  • Initial review based on public information
  • We also tell you which documents are missing
  • Clear reasons if a site is not eligible

Eligibility checklist

Before entrusting, six conditions to check first

You do not need to judge everything yourself. Sort out the items you can check at this point, and we will check anything unclear in the assessment.

  1. 01

    Landowner consent

    A letter of consent from the landowner, or documents that confirm an equivalent agreement, are available.

  2. 02

    Reply to the connection study

    Documents that show the grid connection conditions, such as the reply to the connection application, are available.

  3. 03

    Application documents that match up

    Depending on the project, we may ask you to submit additional documents, such as a copy of the connection application form.

  4. 04

    Hazard risk

    We check whether we can handle the site under our criteria, taking into account the type of hazard, the expected depth and the equipment layout.

  5. 05

    Response terms and project viability

    Project viability may not be secured because of deficiencies in the application or the conditions in the response.

  6. 06

    Expected schedule

    We check the expected period for connection and construction, and judge whether the site can go ahead as an entrustment.

The above are the main points checked in the initial assessment. Whether we can finally handle the site, and the contract terms, are decided based on the individual documents and the survey results.

A flat candidate site showing how the road frontage and power facilities are positioned

Quick judgment

Check your next step from the situation closest to yours

Rather than a simple choice between “meets the conditions” and “does not”, we separate out the projects that can move forward with additional checks.

Ready to move to the assessment
Landowner agreement and the response are in place, and there are no major concerns about hazards or the application conditions.
Share the documents and go to the free DD assessment.
Additional checks needed
There is a response but you are not sure how to read it, the copy of the application is missing, or the site may fall within a hazard area.
We sort out the missing documents and the issues to check in the assessment.
May be difficult to handle
Landowner agreement cannot be confirmed, there are serious deficiencies in the application, or the risk is high under our criteria.
We check individually why it is not possible and whether there are alternatives.

Common pitfalls

Before entrusting, 3 issues that are easy to overlook

The size and look of the land alone cannot tell you whether it is suitable as a grid-scale battery storage (BESS) site.

A candidate site where the slope and boundaries are hard to make out

RISK 01

Do not judge hazards only by “in or out”

We judge by combining the type of hazard, the depth, the equipment layout, and the evacuation and grading conditions.

A desk where the reply to the connection study and map documents are being checked

RISK 02

The conditions in the response shape project viability

The construction period, the costs and whether the project can go ahead change with the stated conditions and the application status.

A candidate site where the road and equipment layout need to be reviewed

RISK 03

Do not put off road frontage, boundaries and delivery access

Even when the desk conditions look good, the design or construction plan may not work because of the site conditions.

Free pre-check

What the free DD assessment shows

Rather than deciding at once whether we can accept the entrustment, we first make visible the issues and the missing information needed for a decision.

  1. A

    Initial risks based on public information

    We sort out the issues that can be checked, such as hazards, the surrounding environment, noise and buried cultural properties.

  2. B

    Points to check in the response and application documents

    We identify the conditions that may affect project viability and the statements that need additional checks.

  3. C

    Documents to prepare next and how to proceed

    We make the next actions concrete, such as the missing documents, whom to check with and whether an on-site check is needed.

A surveyor checking a candidate site with drawings and a tablet
Hands checking site documents such as the reply to the connection study and maps

Documents

Documents we would like to check in the assessment

You can consult us even if you do not have all of them. Please share what you can prepare at this point.

  • Req.

    Landowner’s letter of consent, etc.

    Documents that confirm the landowner’s consent or an equivalent agreement.

  • Req.

    Reply to the connection study

    Documents that show the grid connection conditions, such as the reply to the connection application.

  • Case

    Copy of the connection application form

    We may ask you to submit it, depending on the project.

  • Opt.

    Documents showing the location and rights

    The cadastral map, land survey map, registered matters, location map and so on, as far as you have them.

Process

The flow from checking the conditions to consultation

After you send the form, we tell you the items to check according to the documents you have and the status of the project.

  1. Send project details

    Enter what you know, such as the location, the rights and the application status.

  2. Share documents

    We check the documents you have, such as the response, letters of consent and maps.

  3. Sort out early issues

    From public information and the documents, we sort out the risks, the missing information and whom to check with.

  4. Guide the next steps

    We share the next stage for your project, such as additional checks, an on-site survey or a discussion of terms.

Case consultation

Even if your site seems to fall outside the conditions, you may still be able to consult us

There is no need to decide at an early stage that a site is ineligible just because documents are missing or because of how the response reads. We separate the issues that can be resolved from those that are difficult.

  • There is a response, but you do not understand what the conditions mean
  • The site may fall within a hazard area and you are unsure how to judge it
  • Landowner agreement is still in progress
  • You have concerns about road frontage, boundaries or delivery access
A staff member and a landowner reviewing site documents during a consultation

Commercial terms

The terms after entrustment are worked out for each project

Price, period, costs and the scope of sales activities change with the conditions in the response, the site risks and so on. We do not state flat rates or guarantees that have no basis.

POINT 01

Sorting out your preferred terms

We check the wishes of the landowner and the broker, the rights and the sales policy.

POINT 02

Reflecting the project conditions

We discuss individually, taking into account the connection, construction period, hazards, site conditions and so on.

POINT 03

Making the costs and contract scope clear

After confirming the formal terms we are able to disclose, we present the costs, the contract scope and points to note individually.

FAQ

Frequently asked questions about entrustment terms

Can I consult you about land that has no reply to the connection study?

Yes, you can. However, the content of the reply to the connection study is important for a formal decision on entrustment. We check your current application status and sort out the procedures needed next.

If a site falls within a hazard area, is it always ruled out?

We do not judge across the board. We check the type of hazard, the expected depth, evacuation and grading conditions, the equipment layout and so on. If the risk is high under our criteria, we may not be able to handle the site.

Is a letter of consent from the landowner required?

A letter of consent from the landowner, or documents that confirm an equivalent agreement, are required. For brokered projects, we also check who holds the authority to act.

Do you also need a copy of the connection application form?

We may ask you to submit it, depending on the project. First, please share the response and the application documents you have.

I cannot judge for myself whether the land meets the conditions.

In the free DD assessment, we sort out the issues based on public information and the documents you provide. Even if your documents are not complete, please consult us with what you can prepare.

Does the assessment include an on-site survey?

The initial assessment is based mainly on a desk review, public information and the documents you provide. We tell you for each project whether an on-site check is needed, and when.

After entrusting the site, can we still look for buyers ourselves?

It depends on the contract terms. We give individual guidance on the formal terms we are able to disclose, such as the scope of sales activities, whether the arrangement is exclusive or sole, and the costs.

A landowner and a staff member consulting over spread-out site documents

Why not start by sorting out, free of charge, whether your land can be entrusted?

It is fine if documents are missing. We check where you stand now and tell you the information needed next and whether a consultation is possible.