We provide battery storage stations with land and secured grid connection capacity, covering the site, the grid connection and the equipment in one package. The results of hazard and other surveys and the sales price are shown as they are for each property.
FOR SELLERS
We sell properties on behalf of owners.
We receive a brokerage fee of 5% (excl. tax) from the seller. We handle everything from listing the property information to coordinating with the buyer.
High-voltage battery storage stations with land and secured connection capacity
These are grid-scale battery storage (BESS) station properties sold by REVIX JAPAN. Each property is planned to have batteries with an output of about 2MW (about 2,000kW AC) on land for which capacity to connect to the utility grid has been secured. We hand over the site, the grid connection and the equipment together.
For properties whose battery manufacturer is NEXTES, the batteries have obtained the JC-STAR★1 conformity label (the IoT product security conformity assessment scheme run by IPA, the Information-technology Promotion Agency, Japan; the label confirms the security of equipment that is controlled remotely).
For each property, we show the survey results for flooding, landslides, tsunami, liquefaction, noise and buried cultural properties. The surveys are based on public information and inquiries to municipalities, and the survey date differs by property.
The property materials include the price, a simulation of expected revenue and the connection conditions. The preconditions and risks are also disclosed in the property materials. For how to look at these properties as an investment, see “How to Think About Investing in High-Voltage BESS”.
Gosen, Niigata: Grid-scale BESS Site 1 (For sale, sales price 600 million yen excl. tax)
Property information
Location
Gosen, Niigata (details provided with the requested materials)
Rated output (AC)
1,999kW
Battery manufacturer
NEXTES
Model
CE007-1157/2315 (container type)
Land area
539m²
Land category
Farmland (Class 2 farmland)
City planning
Non-area-divided city planning area
Utility service area
Tohoku Electric
Grid connection
Connection capacity secured (high voltage)
Due diligence
Completed (DD completed)
Project type
Third-party project
JC-STAR
★1 obtained (battery)
Notes
Because the land category includes farmland, a permission procedure for farmland conversion (Article 5 of the Agricultural Land Act) is required for handover.
Hazard and environmental survey
Flooding (projected)
None identified
Landslide warning area
None identified
Tsunami (projected)
None identified
Liquefaction
No likelihood
Noise regulation
No regulation
Buried cultural properties
Outside known archaeological sites (none identified)
Gosen, Niigata, Site 1 (Tohoku Electric service area, AC 1,999kW)
This high-voltage battery storage station is to be built on land in Gosen, Niigata (farmland (Class 2), 539m², non-area-divided city planning area). The rated output is AC 1,999kW. The battery is the NEXTES CE007-1157/2315 (JC-STAR★1 conformity label obtained). The sales price is 600 million yen (excl. tax), and handover is expected around August 2029.
The site is outside the projected flooding, landslide and tsunami areas. Liquefaction: “No likelihood”; noise regulation: “No regulation”; buried cultural properties: “Outside known archaeological sites”. Due diligence (DD) has been completed (DD was carried out by another company for this project). Because the land is farmland, farmland conversion permission under Article 5 of the Agricultural Land Act is required for handover.
Gosen, Niigata: Grid-scale BESS Site 2 (For sale, sales price 650 million yen excl. tax)
Property information
Location
Gosen, Niigata (details provided with the requested materials)
Rated output (AC)
1,999kW
Battery manufacturer
NEXTES
Model
Please contact us for details
Land area
1,139m²
Land category
Residential land
City planning
Non-area-divided city planning area
Utility service area
Tohoku Electric
Grid connection
Connection capacity secured (high voltage)
Due diligence
Completed (DD completed)
Project type
Third-party project
JC-STAR
★1 obtained (battery)
Notes
Hazard and environmental survey
Flooding (projected)
None identified
Landslide warning area
None identified
Tsunami (projected)
None identified
Liquefaction
Possible
Noise regulation
45dB
Buried cultural properties
Outside known archaeological sites (none identified)
Gosen, Niigata, Site 2 (Tohoku Electric service area, AC 1,999kW)
This high-voltage battery storage station is to be built on land in Gosen, Niigata (residential land, 1,139m², non-area-divided city planning area). The rated output is AC 1,999kW. The battery model will be given in the property materials (the equipment delivered will have the JC-STAR★1 conformity label). The sales price is 650 million yen (excl. tax), and handover is expected around May 2028.
The site is outside the projected flooding, landslide and tsunami areas. Liquefaction: “Possible”; noise regulation: “45dB”; buried cultural properties: “Outside known archaeological sites”. Due diligence (DD) has been completed.
Yuza, Yamagata: Grid-scale BESS Site (For sale, sales price 690 million yen excl. tax)
Property information
Location
Yuza, Akumi, Yamagata (details provided with the requested materials)
Rated output (AC)
1,994kW
Battery manufacturer
Please contact us for details
Model
Please contact us for details
Land area
1,251m²
Land category
Wild land
City planning
Urbanization promotion area
Utility service area
Tohoku Electric
Grid connection
Connection capacity secured (high voltage)
Due diligence
Completed (DD completed)
Project type
Third-party project
Notes
Hazard and environmental survey
Flooding (projected)
None identified
Landslide warning area
None identified
Tsunami (projected)
None identified
Liquefaction
Low likelihood
Noise regulation
50dB
Buried cultural properties
Outside known archaeological sites (none identified)
Yuza, Akumi, Yamagata (Tohoku Electric service area, AC 1,994kW)
This high-voltage battery storage station is to be built on land in Yuza, Akumi, Yamagata (wild land, 1,251m², urbanization promotion area). The rated output is AC 1,994kW. The battery manufacturer and model will be given in the property materials. The sales price is 690 million yen (excl. tax), and handover is expected from May 2028.
The site is outside the projected flooding, landslide and tsunami areas. Liquefaction: “Low likelihood”; noise regulation: “50dB”; buried cultural properties: “Outside known archaeological sites”. Due diligence (DD) has been completed.
Otaki, Chiba: Grid-scale BESS Site (For sale, sales price 650 million yen excl. tax)
Property information
Location
Otaki, Isumi, Chiba (details provided with the requested materials)
Rated output (AC)
1,998kW
Battery manufacturer
NEXTES
Model
Please contact us for details
Land area
1,137m²
Land category
Farmland (class under inquiry with the municipality)
City planning
Outside city planning areas
Utility service area
TEPCO
Grid connection
Connection capacity secured (high voltage)
Due diligence
Completed (DD completed)
Project type
Third-party project
JC-STAR
★1 obtained (battery)
Notes
Because the land category includes farmland, a permission procedure for farmland conversion (Article 5 of the Agricultural Land Act) is required for handover.
Hazard and environmental survey
Flooding (projected)
None identified
Landslide warning area
None identified
Tsunami (projected)
None identified
Liquefaction
No likelihood
Noise regulation
50dB
Buried cultural properties
Known site of buried cultural properties (notification required under Article 93 of the Act on Protection of Cultural Properties)
Otaki, Isumi, Chiba (TEPCO service area, AC 1,998kW)
This high-voltage battery storage station is to be built on land in Otaki, Isumi, Chiba (farmland (class under inquiry), 1,137m², outside city planning areas). The rated output is AC 1,998kW. The battery model will be given in the property materials (the equipment delivered will have the JC-STAR★1 conformity label). The sales price is 650 million yen (excl. tax), and handover is expected around September 2028.
The site is outside the projected flooding, landslide and tsunami areas. Liquefaction: “No likelihood”; noise regulation: “50dB”; buried cultural properties: “Known site of buried cultural properties”. Due diligence (DD) has been completed. Because the land is farmland, farmland conversion permission under Article 5 of the Agricultural Land Act is required for handover.
Chikusei, Ibaraki: Grid-scale BESS Site (For sale, sales price 800 million yen excl. tax)
Property information
Location
Chikusei, Ibaraki (details provided with the requested materials)
Rated output (AC)
1,994kW
Battery manufacturer
Please contact us for details
Model
Please contact us for details
Land area
3,213m²
Land category
Forest land
City planning
Urbanization control area
Utility service area
TEPCO
Grid connection
Connection capacity secured (high voltage)
Project type
Third-party project
Notes
Hazard and environmental survey
Flooding (projected)
None identified
Landslide warning area
None identified
Tsunami (projected)
None identified
Liquefaction
Low likelihood
Noise regulation
Under inquiry with the municipality
Buried cultural properties
Under inquiry with the municipality
Chikusei, Ibaraki (TEPCO service area, AC 1,994kW)
This high-voltage battery storage station is to be built on land in Chikusei, Ibaraki (forest land, 3,213m², urbanization control area). The rated output is AC 1,994kW. The battery manufacturer and model will be given in the property materials. The sales price is 800 million yen (excl. tax), and handover is expected around March 2027.
The site is outside the projected flooding, landslide and tsunami areas. Liquefaction: “Low likelihood”. Noise regulation and buried cultural properties are under inquiry with the city. The status of due diligence will be given in the property materials.
Nabari, Mie: Grid-scale BESS Site (For sale, sales price 650 million yen excl. tax)
Property information
Location
Nabari, Mie (details provided with the requested materials)
Rated output (AC)
1,997kW
Battery manufacturer
Please contact us for details
Model
Please contact us for details
Land area
2,678m²
Land category
Forest land and wild land
City planning
Non-area-divided city planning area
Utility service area
Chubu Electric
Grid connection
Connection capacity secured (high voltage)
Due diligence
Completed (DD completed)
Notes
Hazard and environmental survey
Flooding (projected)
None identified
Landslide warning area
None identified
Tsunami (projected)
None identified
Liquefaction
No likelihood
Noise regulation
50dB
Buried cultural properties
Outside known archaeological sites (none identified)
Nabari, Mie (Chubu Electric service area, AC 1,997kW)
This high-voltage battery storage station is to be built on land in Nabari, Mie (forest land and wild land, 2,678m², non-area-divided city planning area). The rated output is AC 1,997kW. The battery manufacturer and model will be given in the property materials. The sales price is 650 million yen (excl. tax), and handover is expected around April 2028.
The site is outside the projected flooding, landslide and tsunami areas. Liquefaction: “No likelihood”; noise regulation: “50dB”; buried cultural properties: “Outside known archaeological sites”. Due diligence (DD) has been completed.
Kainan, Wakayama: Grid-scale BESS Site (For sale, sales price 650 million yen excl. tax)
Property information
Location
Kainan, Wakayama (details provided with the requested materials)
Rated output (AC)
1,998kW
Battery manufacturer
NEXTES
Model
CE007-1157/2315 (container type)
Land area
857m²
Land category
Farmland (Class 2 farmland)
City planning
Non-area-divided city planning area
Utility service area
Kansai Electric
Grid connection
Connection capacity secured (high voltage)
Due diligence
Completed (DD completed)
Project type
Third-party project
JC-STAR
★1 obtained (battery)
Notes
Because the land category includes farmland, a permission procedure for farmland conversion (Article 5 of the Agricultural Land Act) is required for handover.
Hazard and environmental survey
Flooding (projected)
None identified
Landslide warning area
None identified
Tsunami (projected)
None identified
Liquefaction
High likelihood
Noise regulation
45dB
Buried cultural properties
Outside known archaeological sites (none identified)
Kainan, Wakayama (Kansai Electric service area, AC 1,998kW)
This high-voltage battery storage station is to be built on land in Kainan, Wakayama (farmland (Class 2), 857m², non-area-divided city planning area). The rated output is AC 1,998kW. The battery is the NEXTES CE007-1157/2315 (JC-STAR★1 conformity label obtained). The sales price is 650 million yen (excl. tax), and handover is expected around March 2028.
The site is outside the projected flooding, landslide and tsunami areas. Liquefaction: “High likelihood”; noise regulation: “45dB”; buried cultural properties: “Outside known archaeological sites”. Due diligence (DD) has been completed. Because the land is farmland, farmland conversion permission under Article 5 of the Agricultural Land Act is required for handover.
Kamijima, Ehime: Grid-scale BESS Site (For sale, sales price 650 million yen excl. tax)
Property information
Location
Kamijima, Ochi, Ehime (details provided with the requested materials)
Rated output (AC)
1,999kW
Battery manufacturer
NEXTES
Model
CE007-1157/2315 (container type)
Land area
507m²
Land category
Farmland (Class 2 farmland)
City planning
Outside city planning areas
Utility service area
Chugoku Electric
Grid connection
Connection capacity secured (high voltage)
Project type
Third-party project
JC-STAR
★1 obtained (battery)
Notes
Because the land category includes farmland, a permission procedure for farmland conversion (Article 5 of the Agricultural Land Act) is required for handover.
Hazard and environmental survey
Flooding (projected)
None identified
Landslide warning area
None identified
Tsunami (projected)
None identified
Liquefaction
No likelihood
Noise regulation
No regulation
Buried cultural properties
Under inquiry with the municipality
Kamijima, Ochi, Ehime (Chugoku Electric service area, AC 1,999kW)
This high-voltage battery storage station is to be built on land in Kamijima, Ochi, Ehime (farmland (Class 2), 507m², outside city planning areas). The rated output is AC 1,999kW. The battery is the NEXTES CE007-1157/2315 (JC-STAR★1 conformity label obtained). The sales price is 650 million yen (excl. tax), and handover is expected around August 2027.
The site is outside the projected flooding, landslide and tsunami areas. Liquefaction: “No likelihood”; noise regulation: not applicable (outside the areas designated under the Noise Regulation Act); buried cultural properties: “Under inquiry”. The status of due diligence will be given in the property materials. Because the land is farmland, farmland conversion permission under Article 5 of the Agricultural Land Act is required for handover.
Kurashiki, Okayama: Grid-scale BESS Site 1 (For sale, sales price 650 million yen excl. tax)
Property information
Location
Kurashiki, Okayama (details provided with the requested materials)
Rated output (AC)
1,991kW
Battery manufacturer
NEXTES
Model
Please contact us for details
Land area
735m²
Land category
Miscellaneous land
City planning
Urbanization control area
Utility service area
Chugoku Electric
Grid connection
Connection capacity secured (high voltage)
Due diligence
Completed (DD completed)
JC-STAR
★1 obtained (battery)
Notes
Hazard and environmental survey
Flooding (projected)
Within a projected flooding area (water depth 10.0–20.0m) and a zone where houses may collapse due to flooding (flood flow)
Landslide warning area
Within a landslide warning area (debris flow)
Tsunami (projected)
None identified
Liquefaction
No likelihood
Noise regulation
45dB
Buried cultural properties
Outside known archaeological sites (none identified)
Kurashiki, Okayama, Site 1 (Chugoku Electric service area, AC 1,991kW)
This high-voltage battery storage station is to be built on land in Kurashiki, Okayama (miscellaneous land, 735m², urbanization control area). The rated output is AC 1,991kW. The battery model will be given in the property materials (the equipment delivered will have the JC-STAR★1 conformity label). The sales price is 650 million yen (excl. tax), and handover is expected around April 2028.
For flooding, the site is in a projected flooding area (water depth 10.0–20.0m at the maximum assumed scale) and a zone where houses may collapse due to flooding (flood flow); for landslides, it is in a landslide warning area (debris flow). The site is outside the projected tsunami area. Liquefaction: “No likelihood”; noise regulation: “45dB”; buried cultural properties: “Outside known archaeological sites”. Due diligence (DD) has been completed.
Kurashiki, Okayama: Grid-scale BESS Site 2 (For sale, sales price 600 million yen excl. tax)
Property information
Location
Kurashiki, Okayama (details provided with the requested materials)
Rated output (AC)
1,880kW
Battery manufacturer
NEXTES
Model
Please contact us for details
Land area
1,170m²
Land category
Miscellaneous land
City planning
Urbanization control area
Utility service area
Chugoku Electric
Grid connection
Connection capacity secured (high voltage)
Due diligence
Completed (DD completed)
JC-STAR
★1 obtained (battery)
Notes
Hazard and environmental survey
Flooding (projected)
Within a projected flooding area (water depth 10.0–20.0m) and a zone where houses may collapse due to flooding (flood flow)
Landslide warning area
Within a landslide warning area (debris flow)
Tsunami (projected)
None identified
Liquefaction
No likelihood
Noise regulation
45dB
Buried cultural properties
Outside known archaeological sites (none identified)
Kurashiki, Okayama, Site 2 (Chugoku Electric service area, AC 1,880kW)
This high-voltage battery storage station is to be built on land in Kurashiki, Okayama (miscellaneous land, 1,170m², urbanization control area). The rated output is AC 1,880kW. The battery model will be given in the property materials (the equipment delivered will have the JC-STAR★1 conformity label). The sales price is 600 million yen (excl. tax), and handover is expected around October 2029.
For flooding, the site is in a projected flooding area (water depth 10.0–20.0m at the maximum assumed scale) and a zone where houses may collapse due to flooding (flood flow); for landslides, it is in a landslide warning area (debris flow). The site is outside the projected tsunami area. Liquefaction: “No likelihood”; noise regulation: “45dB”; buried cultural properties: “Outside known archaeological sites”. Due diligence (DD) has been completed.
Under negotiationWe are currently in negotiations with another customer for this property. We also accept applications as the next candidate. If the negotiations do not go through, we will contact applicants in the order in which they applied.
DD completedExternal
Kumagaya, Saitama: Grid-scale BESS Site (Under negotiation, sales price 750 million yen excl. tax)
Property information
Location
Kumagaya, Saitama (details provided with the requested materials)
Rated output (AC)
1,855kW
Battery manufacturer
NEXTES
Model
CE007-1157/2315 (container type)
Land area
1,089m²
Land category
Farmland (Class 1 farmland)
City planning
Urbanization control area
Utility service area
TEPCO
Grid connection
Connection capacity secured (high voltage)
Due diligence
Completed (DD completed)
Project type
Third-party project
JC-STAR
★1 obtained (battery)
Notes
Because the land category includes farmland, a permission procedure for farmland conversion (Article 5 of the Agricultural Land Act) is required for handover.
Hazard and environmental survey
Flooding (projected)
None identified
Landslide warning area
None identified
Tsunami (projected)
None identified
Liquefaction
Very high likelihood
Noise regulation
45dB
Buried cultural properties
Outside known archaeological sites (none identified)
Until handoveraround October 2027
Sales price (excl. tax)750,000,000 yen
Under negotiationWe are currently in negotiations with another customer for this property. We also accept applications as the next candidate. If the negotiations do not go through, we will contact applicants in the order in which they applied.
DD completed
Tsukuba, Ibaraki: Grid-scale BESS Site (Under negotiation, sales price 750 million yen excl. tax)
Property information
Location
Tsukuba, Ibaraki (details provided with the requested materials)
Rated output (AC)
1,997kW
Battery manufacturer
NEXTES
Model
CE007-1157/2315 (container type)
Land area
1,567m²
Land category
Forest land
City planning
Urbanization control area
Utility service area
TEPCO
Grid connection
Connection capacity secured (high voltage)
Due diligence
Completed (DD completed)
JC-STAR
★1 obtained (battery)
Notes
Hazard and environmental survey
Flooding (projected)
None identified
Landslide warning area
None identified
Tsunami (projected)
None identified
Liquefaction
No likelihood
Noise regulation
50dB
Buried cultural properties
Outside known archaeological sites (none identified)
Until handoveraround October 2027
Sales price (excl. tax)750,000,000 yen
Under negotiationWe are currently in negotiations with another customer for this property. We also accept applications as the next candidate. If the negotiations do not go through, we will contact applicants in the order in which they applied.
DD completedExternal
Toki, Gifu: Grid-scale BESS Site 1 (Under negotiation, sales price 700 million yen excl. tax)
Property information
Location
Toki, Gifu (details provided with the requested materials)
Rated output (AC)
1,988kW
Battery manufacturer
NEXTES
Model
CE007-1157/2315 (container type)
Land area
1,183m²
Land category
Farmland (Class 2 farmland)
City planning
Non-area-divided city planning area
Utility service area
Chubu Electric
Grid connection
Connection capacity secured (high voltage)
Due diligence
Completed (DD completed)
Project type
Third-party project
JC-STAR
★1 obtained (battery)
Notes
Because the land category includes farmland, a permission procedure for farmland conversion (Article 5 of the Agricultural Land Act) is required for handover.
Hazard and environmental survey
Flooding (projected)
None identified
Landslide warning area
None identified
Tsunami (projected)
None identified
Liquefaction
No likelihood
Noise regulation
No regulation
Buried cultural properties
Outside known archaeological sites (none identified)
Until handoveraround February 2028
Sales price (excl. tax)700,000,000 yen
Under negotiationWe are currently in negotiations with another customer for this property. We also accept applications as the next candidate. If the negotiations do not go through, we will contact applicants in the order in which they applied.
DD completedExternal
Kakegawa, Shizuoka: Grid-scale BESS Site (Under negotiation, sales price 720 million yen excl. tax)
Property information
Location
Kakegawa, Shizuoka (details provided with the requested materials)
Rated output (AC)
1,979kW
Battery manufacturer
NEXTES
Model
CE007-1157/2315 (container type)
Land area
805m²
Land category
Farmland (Class 3 farmland)
City planning
Non-area-divided city planning area
Utility service area
Chubu Electric
Grid connection
Connection capacity secured (high voltage)
Due diligence
Completed (DD completed)
Project type
Third-party project
JC-STAR
★1 obtained (battery)
Notes
Because the land category includes farmland, a permission procedure for farmland conversion (Article 5 of the Agricultural Land Act) is required for handover.
Hazard and environmental survey
Flooding (projected)
None identified
Landslide warning area
Within a landslide warning area (slope failure)
Tsunami (projected)
None identified
Liquefaction
No likelihood
Noise regulation
45dB
Buried cultural properties
Outside known archaeological sites (none identified)
Until handoveraround September 2027
Sales price (excl. tax)720,000,000 yen
Under negotiationWe are currently in negotiations with another customer for this property. We also accept applications as the next candidate. If the negotiations do not go through, we will contact applicants in the order in which they applied.
DD completedExternal
Tokoname, Aichi: Grid-scale BESS Site (Under negotiation, sales price 800 million yen excl. tax)
Property information
Location
Tokoname, Aichi (details provided with the requested materials)
Rated output (AC)
1,950kW
Battery manufacturer
NEXTES
Model
Please contact us for details
Land area
1,773m²
Land category
Forest land
City planning
Urbanization control area
Utility service area
Chubu Electric
Grid connection
Connection capacity secured (high voltage)
Due diligence
Completed (DD completed)
Project type
Third-party project
JC-STAR
★1 obtained (battery)
Notes
Hazard and environmental survey
Flooding (projected)
None identified
Landslide warning area
None identified
Tsunami (projected)
None identified
Liquefaction
No likelihood
Noise regulation
50dB
Buried cultural properties
Outside known archaeological sites (none identified)
Until handoveraround June 2027
Sales price (excl. tax)800,000,000 yen
Under negotiationWe are currently in negotiations with another customer for this property. We also accept applications as the next candidate. If the negotiations do not go through, we will contact applicants in the order in which they applied.
DD completed
Toyohashi, Aichi: Grid-scale BESS Site (Under negotiation, sales price 650 million yen excl. tax)
Property information
Location
Toyohashi, Aichi (details provided with the requested materials)
Rated output (AC)
1,998kW
Battery manufacturer
NEXTES
Model
CE007-1157/2315 (container type)
Land area
964m²
Land category
Forest land and residential land
City planning
Urbanization control area
Utility service area
Chubu Electric
Grid connection
Connection capacity secured (high voltage)
Due diligence
Completed (DD completed)
JC-STAR
★1 obtained (battery)
Notes
Hazard and environmental survey
Flooding (projected)
None identified
Landslide warning area
None identified
Tsunami (projected)
Within a projected tsunami inundation area (water depth 0.3–1.0m)
Liquefaction
High likelihood
Noise regulation
50dB
Buried cultural properties
Outside known archaeological sites (none identified)
Until handoveraround January 2028
Sales price (excl. tax)650,000,000 yen
Under negotiationWe are currently in negotiations with another customer for this property. We also accept applications as the next candidate. If the negotiations do not go through, we will contact applicants in the order in which they applied.
DD completedExternal
Echizen, Fukui: Grid-scale BESS Site (Under negotiation, sales price 650 million yen excl. tax)
Property information
Location
Echizen, Fukui (details provided with the requested materials)
Rated output (AC)
1,998kW
Battery manufacturer
NEXTES
Model
Please contact us for details
Land area
873m²
Land category
Farmland (Class 3 farmland)
City planning
Non-area-divided city planning area
Utility service area
Hokuriku Electric
Grid connection
Connection capacity secured (high voltage)
Due diligence
Completed (DD completed)
Project type
Third-party project
JC-STAR
★1 obtained (battery)
Notes
Because the land category includes farmland, a permission procedure for farmland conversion (Article 5 of the Agricultural Land Act) is required for handover.
Hazard and environmental survey
Flooding (projected)
None identified
Landslide warning area
None identified
Tsunami (projected)
None identified
Liquefaction
No likelihood
Noise regulation
55dB
Buried cultural properties
Outside known archaeological sites (none identified)
Until handoveraround August 2027
Sales price (excl. tax)650,000,000 yen
Under negotiationWe are currently in negotiations with another customer for this property. We also accept applications as the next candidate. If the negotiations do not go through, we will contact applicants in the order in which they applied.
DD completedExternal
Ono, Fukui: Grid-scale BESS Site (Under negotiation, sales price 731 million yen excl. tax)
Property information
Location
Ono, Fukui (details provided with the requested materials)
Rated output (AC)
1,999kW
Battery manufacturer
NEXTES
Model
CE007-1157/2315 (container type)
Land area
1,529m²
Land category
Residential land
City planning
Non-area-divided city planning area
Utility service area
Hokuriku Electric
Grid connection
Connection capacity secured (high voltage)
Due diligence
Completed (DD completed)
Project type
Third-party project
JC-STAR
★1 obtained (battery)
Notes
Hazard and environmental survey
Flooding (projected)
Within a projected flooding area (water depth 0.5–3.0m)
Landslide warning area
None identified
Tsunami (projected)
None identified
Liquefaction
High likelihood
Noise regulation
45dB
Buried cultural properties
Outside known archaeological sites (none identified)
Until handoveraround January 2028
Sales price (excl. tax)731,000,000 yen
Under negotiationWe are currently in negotiations with another customer for this property. We also accept applications as the next candidate. If the negotiations do not go through, we will contact applicants in the order in which they applied.
DD completedExternal
Higashimatsuyama, Saitama: Grid-scale BESS Site (Under negotiation, sales price 750 million yen excl. tax)
Property information
Location
Higashimatsuyama, Saitama (details provided with the requested materials)
Rated output (AC)
1,999kW
Battery manufacturer
NEXTES
Model
CE007-1157/2315 (container type)
Land area
784m²
Land category
Farmland (class under inquiry with the municipality)
City planning
Urbanization control area
Utility service area
TEPCO
Grid connection
Connection capacity secured (high voltage)
Due diligence
Completed (DD completed)
Project type
Third-party project
JC-STAR
★1 obtained (battery)
Notes
Because the land category includes farmland, a permission procedure for farmland conversion (Article 5 of the Agricultural Land Act) is required for handover.
Hazard and environmental survey
Flooding (projected)
None identified
Landslide warning area
None identified
Tsunami (projected)
None identified
Liquefaction
Low likelihood
Noise regulation
45dB
Buried cultural properties
Outside known archaeological sites (none identified)
Until handoveraround January 2028
Sales price (excl. tax)750,000,000 yen
Under negotiationWe are currently in negotiations with another customer for this property. We also accept applications as the next candidate. If the negotiations do not go through, we will contact applicants in the order in which they applied.
DD completedExternal
Ogawa, Saitama: Grid-scale BESS Site (Under negotiation, sales price 750 million yen excl. tax)
Property information
Location
Ogawa, Hiki, Saitama (details provided with the requested materials)
Rated output (AC)
1,999kW
Battery manufacturer
NEXTES
Model
CE007-1157/2315 (container type)
Land area
733m²
Land category
Farmland (class under inquiry with the municipality)
City planning
Urbanization promotion area
Utility service area
TEPCO
Grid connection
Connection capacity secured (high voltage)
Due diligence
Completed (DD completed)
Project type
Third-party project
JC-STAR
★1 obtained (battery)
Notes
Because the land category includes farmland, a permission procedure for farmland conversion (Article 5 of the Agricultural Land Act) is required for handover.
Hazard and environmental survey
Flooding (projected)
None identified
Landslide warning area
None identified
Tsunami (projected)
None identified
Liquefaction
No likelihood
Noise regulation
45dB
Buried cultural properties
Known site of buried cultural properties (notification required under Article 93 of the Act on Protection of Cultural Properties)
Until handoveraround January 2028
Sales price (excl. tax)750,000,000 yen
Sold Out
Sold
DD completedSold
Ota, Gunma: Grid-scale BESS Site (Sold, sales price 700 million yen excl. tax)
Property information
Location
Ota, Gunma (details provided with the requested materials)
Rated output (AC)
1,995kW
Battery manufacturer
NEXTES
Model
CE007-1157/2315 (container type)
Land area
763m²
Land category
Forest land
City planning
Urbanization control area
Utility service area
TEPCO
Grid connection
Connection capacity secured (high voltage)
Due diligence
Completed (DD completed)
JC-STAR
★1 obtained (battery)
Notes
Hazard and environmental survey
Flooding (projected)
None identified
Landslide warning area
None identified
Tsunami (projected)
None identified
Liquefaction
Low likelihood
Noise regulation
45dB
Buried cultural properties
Known site of buried cultural properties (notification required under Article 93 of the Act on Protection of Cultural Properties)
Until handoverabout 13 months
Sales price (excl. tax)700,000,000 yen
DD completedExternalSold
Tamba, Hyogo: Grid-scale BESS Site (Sold, sales price 750 million yen excl. tax)
Property information
Location
Tamba, Hyogo (details provided with the requested materials)
Rated output (AC)
1,997kW
Battery manufacturer
NEXTES
Model
CE007-1157/2315 (container type)
Land area
2,602m²
Land category
Forest land
City planning
Non-area-divided city planning area
Utility service area
Kansai Electric
Grid connection
Connection capacity secured (high voltage)
Due diligence
Completed (DD completed)
Project type
Third-party project
JC-STAR
★1 obtained (battery)
Notes
Hazard and environmental survey
Flooding (projected)
None identified
Landslide warning area
None identified
Tsunami (projected)
None identified
Liquefaction
Possible
Noise regulation
60dB
Buried cultural properties
Outside known archaeological sites (none identified)
Until handoverabout 10 months
Sales price (excl. tax)750,000,000 yen
DD completedExternalSold
Katsuyama, Fukui: Grid-scale BESS Site (Sold, sales price TBD)
Property information
Location
Katsuyama, Fukui (details provided with the requested materials)
Rated output (AC)
1,999kW
Battery manufacturer
NEXTES
Model
CE007-1157/2315 (container type)
Land area
1,234m²
Land category
Miscellaneous land
City planning
Non-area-divided city planning area
Utility service area
Hokuriku Electric
Grid connection
Connection capacity secured (high voltage)
Due diligence
Completed (DD completed)
Project type
Third-party project
JC-STAR
★1 obtained (battery)
Notes
Hazard and environmental survey
Flooding (projected)
None identified
Landslide warning area
None identified
Tsunami (projected)
None identified
Liquefaction
Possible
Noise regulation
55dB
Buried cultural properties
Outside known archaeological sites (none identified)
Until handoveraround February 2028
Sales price (excl. tax)TBD
* The handover timing is our current expectation and may move earlier or later depending on the utility's construction work and other factors. The survey results were compiled by us based on public information and inquiries to municipalities. The survey date differs by property. Please check the information published by each municipality for the latest designations.
Please note: These properties are sales of movable property (battery storage equipment) and land, and are not financial products. Expected revenue is an estimate based on preconditions such as market prices and operating rates, and does not guarantee future revenue. The preconditions and risks (changes in electricity market prices, changes to rules and systems, output curtailment, etc.) are disclosed in the property materials. Please check the contract documents for who provides the equipment warranty and what it covers.
We will send you detailed property materials.
We have property materials that include the price, an expected revenue simulation and the connection conditions.