Will my costs go up?
We check who bears which costs, not only for the equipment but also for grading, removal, taxes and the end of the contract.
LANDOWNER FAQ
We have sorted out the points you will want to check before making an inquiry about using land for low-voltage grid-scale battery storage (BESS), from site requirements, costs and safety to contracts and restoration to the original condition.
The answers are general guidance. Whether installation is possible, the rent, cost sharing and the contract terms differ for each piece of land and each project.
BEFORE CONSULTATION
Using land is not something to decide on rent alone. It is important to decide after checking the costs, the neighbors and the terms of a long-term contract.
We check who bears which costs, not only for the equipment but also for grading, removal, taxes and the end of the contract.
We sort out the safety conditions for each candidate site, such as noise, fire, disasters, fences and the distance from homes.
We check the clauses that affect your future options, such as sale, early termination, inheritance, restoration to the original condition and equipment removal.
THREE CHECKPOINTS
In the free assessment, we check not only the “area” of the land but all the conditions for the project to be viable.
We check the area, shape, road frontage, delivery access, surroundings, laws and regulations, and the state of the power grid.
We sort out what the landowner and the operator each bear, such as the equipment, grading, applications, maintenance and taxes.
We confirm in writing the term, the start of rent, cancellation, sale, inheritance, equipment removal and restoration to the original condition.
FREQUENTLY ASKED QUESTIONS
You can find the questions you are interested in by keyword search or by category. If your question is not answered, please apply for a free assessment with information on your land.
Showing all 5 questions.
Questions about whether equipment can go on your land, such as area, shape, farmland and closeness to homes, are answered on the site requirements page.
See the site requirements FAQ Questions about rent, costs and taxesQuestions about money, such as the amount of rent, when it is paid, cost sharing and fixed asset tax, are answered on the revenue model page.
See the revenue model FAQ Questions about contracts, termination and the termThe number of contract years, early termination, selling the land, removal and restoration to the original condition, and the time until operation starts are answered on the installation process page.
See the installation process FAQ Questions about applications and documentsThe information and documents needed first, and a checklist by stage, are covered on the required documents page.
See the required documents page
CATEGORY 01
Questions about the safety design of the equipment, noise, disasters, explanations to the neighbors and consulting specialists.
We check the specifications of the equipment adopted, its protection functions, the construction method, clearances, fences, the maintenance structure and so on, and plan in line with the related laws and regulations and manufacturer standards. Because the choice of equipment and the installation conditions differ for each project, we explain the specific safety specifications in the materials for the formal proposal.
This does not guarantee that accidents or faults will never occur. Please check the equipment specifications and the maintenance terms.
Because the PCS, air conditioning equipment and so on make operating noise, we consider the layout after checking the distance to the site boundary and to nearby homes, the zoning district and the municipality’s standards. Where needed, we consider measures such as clearances, noise barriers and operating conditions, but we do not guarantee that no complaints will ever arise.
The sound pressure level of the equipment on its own differs from the actual noise level at the site boundary. An individual design that includes the on-site conditions is needed.
We check the hazard information for the candidate site, the ground, drainage, foundations, installation height, equipment specifications and so on, and consider the measures needed. For land with a high disaster risk, additional measures may be needed, or we may decide not to proceed with it as a candidate site.
Damage from natural disasters cannot be completely prevented. For insurance, the division of responsibility and recovery work, please check the contract details.
Whether an explanation is needed, and who gives it, is decided according to the local conditions and the details of the project. We sort out the roles of REVIX JAPAN, the equipment operator, the construction company and the landowner, and where needed, we confirm the explanatory materials and the approach in advance.
How coordination with the municipality and the neighbors is handled differs by region.
Yes. Where needed, please consult specialists such as a lawyer, a judicial scrivener, a tax accountant or a licensed real estate broker about the contract details. REVIX JAPAN explains the business terms and the draft contract, but we recommend that individual legal, registration and tax judgments be checked with the relevant specialists.
SCOPE OF SUPPORT
By keeping the check of the business conditions separate from individual legal and tax judgments, you can move your study forward with confidence.
REVIX JAPAN’s free assessment
Checks with specialists and the authorities
FREE LAND DIAGNOSIS
If we know the location or have a map, we can go ahead with an initial check even before the area and the documents are ready. You do not have to sign a contract after consulting us.
The assessment results do not guarantee installation, a contract or rent. The formal terms are fixed after the survey and the contract procedures.