Creating success in grid-scale battery storage, together.

Pre-order sales have started RENON 49.9kW / 133kWh Currently under development Low-voltage grid-scale battery storage, sales price 15 million yen, 5-year warranty

* This product is currently under development. We plan to apply for JC-STAR★1 (the conformity labelling scheme run by IPA). Conformity is checked by the product name, model number, label number and validity period of the equipment adopted.

NEW RELEASE | LOW-VOLTAGE BESS

Low-Voltage BESS | New “49.9kW / 133kWh” product: pre-order sales have started

New product“49.9kW / 133kWh”:
low-voltage grid-scale battery storage
you can start at a sales price of 15 million yen.

A configuration that combines the RENON battery with a PCS and EMS and operates it for low-voltage grid use. The sales price is 15 million yen with a 5-year warranty. It is currently under development, and pre-order sales have started.

Equipment makerRENON

Prices and expected yields (not guaranteed) are reference values based on our estimates (pre-tax, as of November 2026). They vary with the market environment and operating conditions and do not guarantee future revenue. The photo is an installation image.

Pre-order sales have started

A new product
currently under development

15 million yen

Sales price
(includes the complete equipment, installation work and 5-year warranty)

18.29%

Expected yield (not guaranteed; battery-only operation)
pre-tax, our estimate*

49.9kW / 133kWh

Output /
battery capacity

5-year warranty

10-, 15- and 20-year
long-term plans also available

PRODUCT | RENON

“49.9kW / 133kWh”
Sales price 15 million yen, 5-year warranty.
A configuration combining battery, PCS and EMS.

A RENON POWER battery using lithium iron phosphate (LFP) cells. Combined with a PCS and EMS, it is operated for low-voltage grid use.

BatteryCapacity 133kWh. Equipment that charges electricity and delivers it at the times needed. With a built-in BMS, it constantly monitors cell voltage and temperature. PCSConverts between the direct current of the battery and the alternating current of the grid. The equipment and settings are checked to match low-voltage connected operation at 49.9kW. EMS and communication/meteringControls charging and discharging based on monitoring data and the operating plan, and takes part in market operation in coordination with the aggregator.
Exterior of the RENON battery cabinet

The photo is an image of the exterior of a RENON product.

System configurationThe 3 roles of battery, PCS and EMS

Aggregator (market operation)
EMS and communication/meteringMonitoring, charge/discharge control
Control & monitoring
Battery133kWh, LFP, built-in BMSStores electricity
DC
PCS49.9kW, DC⇄AC conversionConverts electricity
AC
Power gridLow-voltage connection, under 50kW

This explains the role of each piece of equipment. The specific models and specifications of the PCS, EMS, communications and so on are confirmed in the final specifications to match the equipment configuration adopted.

POINT 01

Communication security standard (JC-STAR)

For low voltage (under 50kW), a policy has been set out to require JC-STAR★1 or above for covered control equipment that uses IP communication, starting with contract applications for grid connection made in or after October 2027. This product is currently under development, and we plan to apply for JC-STAR★1.

POINT 02

49.9kW × 133kWh

A configuration that combines the RENON battery with a PCS and EMS and operates it for low-voltage grid use.

POINT 03

Sales price 15 million yen, 5-year warranty

A plan with everything from installation to long-term operation in view. The expected yields (not guaranteed) by operating method are shown in the revenue simulation below.

Output (PCS)49.9kW (for low-voltage connection)
Battery capacity133kWh
Cell typeLFP (LiFePO4, lithium iron phosphate)
Battery managementBuilt-in BMS (constantly monitors and manages cell voltage and temperature)
EMSCharge and discharge control, aggregator integration
MonitoringSupports remote monitoring and control
InstallationOutdoor cabinet
Dimensions (W×D×H)1,250×1,012×2,300 mm
WeightAbout 2,050 kg
Cooling methodForced air cooling
Noise level75 dB(A) or less (at 1 m)
Warranty5-year warranty (10-, 15- and 20-year long-term plans also available)
Sales price15 million yen (5-year warranty) / 16 million yen (10-year warranty)
RENON

RENON POWER | A RENON POWER battery using lithium iron phosphate (LFP) cells, combined with a PCS and EMS and operated for low-voltage grid use.

RENON POWER official website ↗

* The sales price includes the complete set of equipment such as the battery, PCS and EMS, installation work (foundations, mounting and wiring) and a 5-year warranty. It does not include the grid connection construction cost, transport costs or the land price. * The dimensions and weight are those of the battery cabinet; the PCS is separate. The noise level is the value at 1 m from the equipment. The model, voltage and so on are confirmed in the final specifications of the equipment adopted.

* Noise is judged by the sound pressure at the site boundary, not by the distance to houses. There are standards for each land-use zone, area classification and time of day.
* Whether notification is needed and the regulatory standards differ with the municipality where the equipment is installed, the land-use zone, the equipment specifications and the operating hours. We check whether notification is needed and the site-boundary standards in the initial design.

REVENUE SIMULATION

Revenue simulation (pre-tax, our estimate)

In our estimate, battery-only operation outperforms operation co-located with solar. The expected yields (not guaranteed) by equipment capacity and warranty period are as follows.

Comparison of expected yields (not guaranteed)5-year warranty, pre-tax, our estimate

New productLow-voltage battery dedicated to balancing 49.9kW / 133kWhSales price 15 million yen

Battery-only operation18.29%
Co-located with solar*12.41%

Low-voltage battery for co-location with renewables 49.9kW / 200kWhSales price 25 million yen

Battery-only operation10.78%
Co-located with solar*8.10%

For the 10-year warranty figures and the conditions of the estimate, see the table and notes below.

ConfigurationWarranty periodSales priceBattery-only operationCo-located with solar*
Low-voltage battery dedicated to balancing
49.9kW / 133kWh
5 years15 million yen18.29%12.41%New product
Low-voltage battery dedicated to balancing
49.9kW / 133kWh
10 years16 million yen17.12%11.73%
Low-voltage battery for co-location with renewables
49.9kW / 200kWh
5 years25 million yen10.78%8.10%Solar co-location
recommended
Low-voltage battery for co-location with renewables
49.9kW / 200kWh
10 years26 million yen10.35%7.80%

* The figures are the expected yield (pre-tax, not guaranteed) for a landholder. * The balancing market is estimated at 6.4 yen. * Operation co-located with solar is estimated with an equipment cost of the price + 3 million yen. * The sales price includes the complete set of equipment such as the battery, PCS and EMS, installation work (foundations, mounting and wiring) and a warranty for the warranty period in the table. It does not include the grid connection construction cost, transport costs or the land price. * The yield for operation co-located with solar is an overall figure: the income and expenses on the battery side plus the solar power sales revenue that increases with the installation of the battery (recovery of curtailed and peak-cut output and shifting it to the evening). It does not include the existing solar power sales revenue or the solar equipment costs. The denominator is the total investment in the battery. * In addition to 5 and 10 years, long-term warranty plans of 15 and 20 years are also available. Prices and expected yields (not guaranteed) for these are quoted individually.

• This product is a sale of movable property (battery storage equipment) and is not a financial product.

• This simulation gives pre-tax reference values based on assumptions we have set. Actual revenue varies with the size of the plant, the utility service area, market prices, bidding and award results, operating conditions and so on, and does not guarantee future revenue. We prepare detailed estimates individually.

• There is a risk that revenue changes due to changes in the power market rules and in market prices.

Revenue model: primary balancing capacity (offline) as the core × 24-hour operation

Primary balancing capacity (offline) (day-ahead product, 30-minute slots) 1.5 hours of charging between 3:00 and 6:00 (SOC maintenance, 30-minute slots)
0:006:0012:0018:0024:00

* 48 slots = 30-minute units: primary balancing capacity (offline) 45/48 slots, charging 3/48 slots

Why primary balancing capacity (offline) is the core

Because it makes it easier to combine stable revenue with a lower operating burden.

  • Revenue centres on the standby payment (ΔkW), so it is easier to forecast
  • The bid price is easy to design based on “the opportunity cost of using the capacity in other markets + a fixed amount”

How tertiary balancing capacity 2 and the wholesale power market are handled

  • The operating burden of price forecasting, bid updates, SOC management and so on increases, and aggregator fees also tend to increase
  • We do not stay out of the wholesale power market: we use it only for SOC maintenance charging in a low-price window within Block 2 (1.5 hours between 3:00 and 6:00)
  • Depending on market prices and constraints, tertiary balancing capacity 2 and the wholesale power market may be used as a complement

Why battery-only operation rather than co-location with solar

REASON 01

Battery-only operation is a design that makes investment efficiency easier to raise

When primary balancing capacity (offline) is the core, battery-only operation is less affected by solar generation and power sales plans, so SOC maintenance charging and standby operation can be designed flexibly. This makes it easier to focus on market operation, and the configuration makes investment efficiency easier to raise.

REASON 02

The balancing market is about 5 times the wholesale power market

The main source of revenue for the battery is the standby payment in primary balancing capacity (offline). The balancing market has about 5 times the revenue potential of the wholesale power market, where solar mainly takes part, in other words selling power on JEPX.

REASON 03

Standby payments need freedom to charge and discharge

In primary balancing capacity (offline), it is important to stay ready to respond at any time. By not being tied to solar FIT/FIP or power sales plans, SOC maintenance charging between 3:00 and 6:00 and offline standby can be designed flexibly.

* Yields and revenue potential are based on our estimates and assumptions, and vary with the market environment, award results and operating conditions.

CautionCHECK | Electrical safety management, JC-STAR and the risks of equipment replacement

3 things to check before installation

We have summed up in 3 points what needs checking even for low-voltage grid-scale battery storage: electrical safety management, the communication security standard (JC-STAR) and the risks of equipment replacement.

01Electrical safety management for low-voltage battery storage stations

“It is low voltage, so no procedures are needed” is wrong.
Even at 49.9kW, a chief electrical engineer and safety regulations are required.

Is this in your simulation?

A stand-alone grid-scale battery storage station cannot be treated the same as a household battery just because it is “low voltage” and “49.9kW”.

Stand-alone low-voltage grid-scale battery storage station

Chief electrical engineer structureRequired

Notification of safety regulationsRequired

Battery co-located with solar
(solar of 10kW or more and under 50kW)

Chief electrical engineer structureExempt

Notification of safety regulationsExempt

Our approachBased on the candidate site, the equipment configuration and the quotation, we sort out the safety structure and costs required.

See details: the 3 obligations the installer prepares for

The 3 obligations the installer prepares for

  1. Set up a chief electrical engineer structureEven when outsourcing, check the eligibility requirements and the prescribed approval procedure.Electricity Business Act, Article 43
  2. Establish and notify safety regulationsDecide on and notify the rules for inspection, operation, responses to abnormalities and records.Electricity Business Act, Article 42
  3. Keep up inspections and responses to abnormalitiesMaintain conformity with technical standards. Record conditions and responses, and decide in advance who is in charge and the contact for abnormalities.Electricity Business Act, Article 39

Even at low voltage, procedures differ by type of equipment

Even equipment below the size covered by construction plan notification and similar requires a safety structure, safety regulations and maintenance of conformity with technical standards.

Both stand-alone battery storage stations and batteries co-located with solar need to maintain conformity with technical standards. Batteries with a capacity over 20kWh are subject to accident reporting (from November 20, 2025).

* Solar is not uniformly “exempt from safety requirements” either. Batteries attached to homes or to solar are treated differently from stand-alone battery storage stations. How the rules apply differs with the configuration and size of the equipment.

Our own research (October 2026, relevant ministries and agencies) | PR TIMES November 2, 2026Is this in your simulation? Low-voltage batteries need electrical safety management ↗

Sources: Electricity Business Act, Articles 39, 42 and 43 / Ordinance for Enforcement of the Electricity Business Act, Article 52, Paragraph 2 / Ordinance on Reporting Related to Electricity (in force from November 20, 2025) / Ministry of Economy, Trade and Industry, “Guide to Installing Power Storage Devices (Batteries) and Battery Storage Stations” / Kanto-Tohoku Industrial Safety and Inspection Department, “Approval System for Outsourcing” (checked on October 27, 2026)

02JC-STAR | Communication security standard

From October 2027,
equipment without a ★ will likely no longer be able to connect.

JC-STAR is the conformity labelling scheme of IPA (Information-technology Promotion Agency, Japan) that evaluates and makes visible the security functions of IoT products against a common standard. Remote monitoring and charge/discharge control are carried out over IP communication, so secure communication is a premise of the business.

Extra-high and high voltageProjects whose contract applications are accepted from April 2027 onward
Low voltage (under 50kW)Contract applications from October 2027 onward (policy)

It is not required retroactively for existing equipment or for projects already applied for. However, replacing equipment is a different matter.

JC-STAR for this productThis product (49.9kW / 133kWh) is currently under development, and we plan to apply for JC-STAR★1. RENON POWER has obtained the JC-STAR★1 conformity label for 3 products: ECube 215B, MPack 261A and Smart Matrix B (IPA “List of Products with Conformity Labels”).

See details: covered equipment, ★ levels and the 3 points to check at installation

Which equipment needs it

The following equipment with IP communication functions is covered.

  • Gateways
  • Output control devices such as the PCS, BMS and EMS
  • Remote monitoring devices

* Equipment with IP communication functions is covered even if it is logically separated (Agency for Natural Resources and Energy Q&A, Q7)

Why JC-STAR support matters

  1. Meeting the requirements of the schemeYou may be asked to show the conformity label in a contract application for grid connection or an application for a subsidy.
  2. Reducing cyber riskPrevents unauthorized access to, and erroneous operation of, remote monitoring and charge/discharge control.
  3. A basis for operation that does not stopWe build a configuration that can be operated for a long time, with the procedures for replacing equipment in view.

★ levels

LevelContentWho checksStatus
★1Basic security requirementsSelf-declaration of conformityIn operation since March 2025
★2Requirements for each product typeSelf-declaration of conformityRolled out in turn, starting with communication equipment
★3, ★4Higher requirementsThird-party evaluation bodyApplications to be accepted from 2027 onward

The more ★, the higher the requirements. What grid connection currently requires is “★1 or above”.

3 points to check at installation

  1. Equipment configurationCheck the adopted equipment that uses IP communication, such as the PCS, EMS and BMS.
  2. Conformity informationCheck the product name, model number, label number and validity period.
  3. ScopeCheck whether the equipment and software are within the scope of the evaluation.

Conformity is checked by the product name, model number, label number and validity period of the equipment adopted. The models of the equipment adopted are confirmed in the final specifications.

Sources: IPA, “Overview of the JC-STAR Scheme” / Agency for Natural Resources and Energy, “Cybersecurity Measures for Distributed Energy Resources” (July 2026), FAQ Q7 and Q10 / Grid Code Study Group, 21st meeting, Material 4 (March 31, 2026)

03JC-STAR and the risk of equipment replacement 5 years on

If that battery storage station breaks down, can it be repaired?
One failure can mean about 11 months of downtime if it drags on.

Even after grid connection, a ★ is required when equipment is replaced because of a failure. Replacing it even with the same model is not a “minor change”, and an application for a connection study is needed.

Downtime for a replacement (decided by the transmission and distribution operator)

Smooth caseAbout 3 months
Prolonged caseAbout 11 months
  1. Diagnosis and model selection
  2. Reply to the connection study
  3. Reply to the contract application
  4. (Grid connection test ▶ work on the transmission and distribution side)
  5. Installation and test operation

* About 11 months is not an upper limit. The 3 months for the connection study and 1 month for the contract reply are the published standard response periods; the rest are our assumptions. While operation is stopped, market income stops, but maintenance costs and loan repayments continue.

Our approachWe check everything up to successor products, parts supply and cooperation with testing at the time of replacement. For this product, we plan to apply for JC-STAR★1.

See details: the procedures for replacement and the 4 points to confirm in writing before purchase

A ★ is required even when replacing because of a failure

1. Grid connection (applied for before the requirement applies)○ ★1 not required
2. Continue operating without replacement○ No need to replace with ★1 products
3. Replace the PCS or other equipment because of a failure (after the requirement applies)The replacement equipment needs ★1 or above

The government materials give “replacing only some of the PCS units because of a failure” as an example. Having spare parts and being allowed to connect to the grid are separate matters.

* For low voltage, this depends on the practice of each transmission and distribution operator after the requirement applies from October 2027 onward.

The transmission and distribution operator decides. If it drags on, about 11 months of downtime

Replacement with equipment without ★1 (an exception) is allowed only where it would be an excessive burden, such as having to replace a wide range of other equipment as well, and only by submitting a plan (1. why it is difficult, 2. the deadline for making all units ★1, 3. measures until then). In our interviews, we were told that switching to different equipment requires tests and changes to the transformer, and is not easy.

The ★ at replacement is “the requirement at that time”

The current guideline is “★1 or above”. The ★ required at replacement depends on the guideline at that time.

Our view
The scheme has been developed at a pace of about one stage a year. We think that when equipment is replaced in 5 years, ★3 or above may be required.

Even equipment with the ★1 label still has to be checked against the technical requirements for grid connection (islanding detection, FRT and so on) and for consistency with the existing equipment. The label alone does not mean that replacement and the restart of operation will be approved.

4 points to confirm in writing before purchase

  1. That the adopted PCS meets the requirements of the installation area and voltage class (islanding detection method, FRT, etc.)
  2. Who to check with, and who is in charge, for the procedures, period, tests and work when replacing the PCS
  3. Cooperation with testing, provision of technical materials and supply of parts and successor models under the maintenance contract, and what happens if the manufacturer withdraws
  4. A revenue plan that factors in the downtime, recovery costs and loss of income during a replacement
Our own research (October 2026, relevant ministries and agencies) | PR TIMES November 9, 2026If that battery storage station breaks down, can it be repaired? JC-STAR and the risk 5 years on ↗

Sources: Agency for Natural Resources and Energy, “Cybersecurity in the Electricity Sector” (updated October 16, 2026), Q&A Q3, Q7 and Q11 / same agency, “Cybersecurity Measures for Distributed Energy Resources”, pp. 11–13 / Organization for Cross-regional Coordination of Transmission Operators (OCCTO), “Flow of Grid Access for Power Generation Facilities, etc.” (July 2026)

WHY 133kWh

Why “49.9kW / 133kWh” is our standard lot

49.9kW / 133kWh is a standard design that balances “ease of installation, operability and investment efficiency”.

REASON 01

200kWh tends to be over-investment

If you carry out full-scale charge-and-discharge arbitrage in the wholesale power market, 200kWh is also an option. However, the core here is the standby payment in the primary balancing capacity (offline) market. Even if you spend more to operate a “49.9kW/200kWh” system, profitability is not greatly different from the 133kWh model. That is why 133kWh, which secures the operating capacity needed while holding down the initial investment, is the capacity with a good balance of cost and revenue.

REASON 02

In primary balancing capacity (offline), an effective 50kWh is enough

The standard operation in the primary balancing capacity (offline) market is “1.5 hours of charging late at night (3:00–6:00) ▶ offline standby for the rest of the time”. What is required during standby is an effective margin of around 50kWh, enough to respond for about 1 hour when an instruction comes. However, no “49.9kW/50kWh” model exists, so we adopted “49.9kW/133kWh” as a realistic configuration that includes the SOC operating range and a margin for degradation over the years.

REASON 03

The larger the capacity, the more likely it is to count as a small quantity of hazardous materials

As the storage capacity grows, the amount of electrolyte increases, raising the likelihood of counting as a “small quantity of hazardous materials” under the Fire Service Act and fire prevention ordinances. If it does, signage, notification and compliance with installation standards may be required, and in residential areas or next to commercial facilities and factories, explaining to neighbours and obtaining permission to install become harder. That is why 133kWh is a realistic capacity design that keeps the risk lower than the 200kWh class and makes installation more feasible.

* Whether it applies needs to be checked individually, based not on the storage capacity but on the amount of electrolyte, the installation conditions and the judgement of the local fire department.

Inside a RENON low-voltage grid-scale battery storage cabinet with the door open

The photo is an image of a RENON product with the door open.

How 133kWh is used (primary balancing capacity (offline))

0133kWh

The margin that can respond for about 1 hour when an instruction comes is an effective 50kWh or so. * The figure is an illustration.

A realistic standard lot for low-voltage batteries, taking into account the risks under the Fire Service Act, operation in primary balancing capacity (offline), and the balance between initial investment and profitability.

OPERATION | Operating image of a low-voltage distributed battery storage station

21 lots form a low-voltage distributed BESS
of about 1MW class / about 2.79MWh.

We configure the RENON battery (133kWh) with a PCS and EMS as a standard lot for low-voltage 49.9kW. Multiple lots are bundled through EMS and communication/metering units and used as a low-voltage distributed BESS, with market operation by an aggregator in view.

Solution for low-voltage BESSOperating multiple lots together

Aggregator
Grid
Centralized control by EMS

Virtual BESS

Local EMS
Lot 01
Local EMS
Lot 02
Local EMS
Lot 03
Local EMS
Lot 04
Local EMS
Lot 21

21 lots = about 1.05MW / about 2.79MWh

Output49.9kWper lot
×
Number of lots21 lots25 or more sites recommended*
=
TotalAbout 1.05MW (1,047.9kW)
Battery capacity133kWhper lot
×
Number of lots21 lots25 or more sites recommended*
=
TotalAbout 2.79MWh (2,793kWh)

Standard configuration per lot

  • RENON battery 133kWh × 1 unit
  • 49.9kW PCS × 1 unit (for low-voltage connection)
  • EMS and communication/metering unit
  • Aggregator integration assumed

* 21 sites is the minimum capacity needed; to allow for the impact if one unit goes down and the total falls below 1MW, we recommend 25 or more sites. * Whether market participation is possible and the operating conditions need to be checked individually, depending on the utility, the connection conditions, the metering method, the EMS, the aggregator contract and so on. * Grid connection equipment such as transformers, protective relays, meters and panels is designed individually depending on the utility, the connection conditions and the installation location.

FLOW

From consultation to start of operation

  1. Inquiry and consultation
  2. Grid connection application and procedures
  3. Ordering and construction of the battery system
  4. Test operation, grid connection and start of operation

The period of each step varies with the project, the utility and the site conditions. We provide an individual schedule.

The battery is a RENON POWER product. The content shown is as of November 2026, and the specifications are confirmed in the final specifications of the equipment adopted.

FAQ

FAQ on the new
RENON product

The answers on price, yield, JC-STAR and electrical safety management change with the project conditions. We sort out the questions you have early in your consideration.

Q1What does the sales price of 15 million yen include?
A

It includes the complete set of equipment such as the battery, PCS and EMS, installation work (foundations, mounting and wiring) and a 5-year warranty. It does not include the grid connection construction cost, transport costs or the land price.

Q2Is the expected yield (not guaranteed) guaranteed?
A

No. It is a pre-tax reference value based on assumptions we have set (with the balancing market estimated at 6.4 yen). Actual revenue varies with the size of the plant, the utility service area, market prices, bidding and award results, operating conditions and so on, and does not guarantee future revenue. We prepare detailed estimates individually.

Q3Why 133kWh rather than 200kWh?
A

Because the core of the revenue is the standby payment in the primary balancing capacity (offline) market. What is required during standby is an effective margin of around 50kWh, enough to respond for about 1 hour when an instruction comes. Operating with 200kWh does not make profitability greatly different from the 133kWh model. We adopted “49.9kW/133kWh” as a realistic configuration that includes the SOC operating range and a margin for degradation over the years.

Q4From when will JC-STAR★1 be required?
A

For low voltage (under 50kW), a policy has been set out to require JC-STAR★1 or above for covered control equipment that uses IP communication, starting with contract applications for grid connection made in or after October 2027 (Grid Code Study Group, 21st meeting, Material 4, March 31, 2026). It is not required retroactively for existing equipment or for projects already applied for, but replacing equipment is a different matter.

Q5Can I choose the warranty period?
A

In addition to the 5-year warranty, long-term plans of 10, 15 and 20 years are available. The sales price with a 10-year warranty is 16 million yen. Prices and expected yields (not guaranteed) for 15 and 20 years are quoted individually.

Q6At 49.9kW, are safety procedures unnecessary?
A

They are not unnecessary. For a stand-alone battery storage station, even at 49.9kW, a safety structure is required, including maintaining conformity with technical standards, notifying safety regulations and appointing a chief electrical engineer.

Q7If I sign a contract with an aggregator, can I also leave electrical safety to them?
A

A contract for market operation alone does not necessarily put a safety structure in place. Who is responsible for safety supervision, inspections and responses to abnormalities is checked separately.

Q8Do I need to employ a chief electrical engineer myself?
A

It can be outsourced. A battery storage station with an output under 5,000kW connected at 7,000V or less does not need to appoint a chief electrical engineer if it signs an outsourcing contract with an electrical safety corporation or an electrical management engineer and obtains the approval of the director of the competent Industrial Safety and Inspection Department (Ordinance for Enforcement of the Electricity Business Act, Article 52, Paragraph 2).

CONTACT

Can you start at this price?
We check it with you, starting from your land conditions.

It is fine if you have not yet decided on a candidate site. Please tell us what you know about the size and location of the land.